My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2026-037278 STMMA - 160 Harrison Avenue
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
2026
>
RecDoc2026-037278 STMMA - 160 Harrison Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 2:35:22 PM
Creation date
8/7/2026 2:35:07 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2026-037278
Rec Date
6/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br />Inspection and Maintenance Checklist <br />Flow -Through Planter Maintenance Plan for <br />Harrison Ave. Multi -Family Building Units E and F <br />5/13/2025 <br />Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing seepage <br />into the underlying soil. They typically receive runoff <br />via downspouts leading from the roofs of adjacent <br />buildings. <br />Project Address and Cross Streets <br />160 Harrison Ave. Redwood City, CA 94061 and <br />Adams St. <br />Assessor's Parcel No. 053-041-220 <br />Property Owner: 160 Harrison Avenue Holding, LLC <br />Phone No.: 650-617-5930 ext. 223 <br />Designated Contact: Dan Lewin <br />Phone No.: 650-617-5930 ext. 223 <br />Mailing Address: 260 Sheridan Ave. Suite 150 Palo Alto, CA <br />94306 <br />The property contains 5 flow-through planters, located as described below and as shown in the attached site <br />plan: <br />• Flow -Through Planter No. 1 is located at the south-west corner of the new ADU (Units E and F). <br />• Flow -Through Planter No. 2 is located at the south-west corner of the new ADU (Units E and F) <br />and adjacent to planter 1. <br />• Flow -Through Planter No. 3 is located at the north-west corner of the existing building at the <br />eastern end of the site (Unit A). <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the flow- <br />through planter and landscaping remains attractive in appearance. Table 1 shows the routine <br />maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Evaluate health of trees and groundcover. Remove and replace all dead and <br />Twice a year <br />diseased vegetation. <br />2 <br />Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />As needed <br />through planter neat and orderly in appearance. <br />Page 1 <br />ATTY/AGR.2026.122/160 Harrison Holding, LLC (160 Harrison Ave) (Page 12 of 16) <br />Updated 1/1/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.