My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2026-037278 STMMA - 160 Harrison Avenue
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
2026
>
RecDoc2026-037278 STMMA - 160 Harrison Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2026 2:35:22 PM
Creation date
8/7/2026 2:35:07 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2026-037278
Rec Date
6/30/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pervious Pavement Maintenance Plan for <br />Harrison Ave. Multi -Family Building Units E and F <br />7/09/2025 <br />Project Address and Cross Streets: 160 Harrison Ave Redwood City, CA 94061 and Adams St. <br />Assessor's Parcel No.: 053-041-220 <br />Property Owner: 160 Harrison Avenue Holding LLC Phone No.: 650-617-5930 ext. 223 <br />Designated Contact: Dan Lewin Phone No.: 650-617-5930 ext. 223 <br />Mailing Address: 260 Sheridan Ave Suite 150 Palo Alto, CA 94306 <br />The property contains 1 pervious pavement area, located and sized as described below and as shown in the <br />attached site plan'. Of those pervious pavement areas, 0 are each 3,000 sq.ft. or more in area. Total square <br />feet of pervious pavement on the site = 2,238 sq.ft.. <br />Square feet of area <br />• Pervious Pavement Area No. 1 is located at the front of the property. 2,238 square feet <br />Routine Maintenance Activities <br />Types of pervious pavement include pervious concrete, porous asphalt, pervious pavers, permeable pavers, <br />and reinforced grid paving. The principal maintenance objective is to prevent sediment buildup and clogging, <br />which reduces infiltration capacity and pollutant removal efficiency. Routine maintenance activities, and the <br />frequency at which they will be conducted, are shown in Table 1. <br />Table 1 <br />Routine Maintenance Activities for Pervious Pavement Areas <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Check for sediment and debris accumulation. Prevent soil from washing or <br />Two to four times annually <br />blowing onto the pavement. Do not store sand, soil, mulch or other <br />landscaping materials on pervious pavement surfaces. <br />2 <br />Conduct preventative surface cleaning, using commercially available <br />Two to four times annually <br />regenerative air or vacuum sweepers, to remove sediment and debris. <br />3 <br />Inspect for any signs of pavement failure. Repair any surface deformations <br />Two to four times annually <br />or broken pavers. Replace missing joint filler between pavers. <br />4 <br />Check for standing water on the pavement surface within 30 minutes after a <br />Two to four times annually <br />storm event. <br />5 <br />Inspect underdram outlets and cleancuts, preferably before the wet season. <br />Two to four times annually <br />Remove trash/debris. <br />6 <br />Remove sediment and debris accumulation on pervious pavement. <br />Two to four times annually <br />7 <br />Remove weeds. Mow vegetation on reinforced grid paving (such as turf <br />As needed <br />block)as needed. <br />8 <br />Perform restorative surface cleaning with a vacuum sweeper, and/or <br />As needed <br />reconstruction of part ofthe pervious surface to restore surface <br />permeability as needed. Replenish aggregate in permeable paverjoints or in <br />grids as needed after restorative surface cleaning. <br />9 <br />Power washing with simultaneous vacuuming also can be used to restore <br />As needed <br />surface infiltration to highly clogged areas of pervious concrete, porous <br />asphalt, pervious pavers or permeable pavers, but is not recommended for <br />reinforced grid paving. <br />' Attached site plan must match the site plan exhibit to Maintenance Agreement. <br />Page 1 <br />ATTY/AGR.2026.122/160 Harrison Holding, LLC (160 Harrison Ave) (Page 15 of 16) <br />Updated 1/1/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.