My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Moffatt & NIchol
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Moffatt & NIchol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 1:16:04 PM
Creation date
12/22/2009 1:16:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Moffatt & Nicol
PROJECT NAME
Consultant Engineering Services
RMP File Number
304
Date
12/7/2009
MO Ref
09-222
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br /> <br />ENGEO <br /> <br />INCORPORATED <br /> <br />GEOTECHNICAL <br />ENVIRONMENTAL <br />WATER RESOURCES <br />CONSTRUCTION SERVICES <br /> <br />Project No. <br />8585.000.000 <br /> <br />June 11, 2009 <br /> <br />Mr. Dilip Trivedi <br />Moffatt & Nichol <br />2001 North Main Street, Suite 360 <br />Walnut Creek, CA 94596 <br /> <br />Subject: <br /> <br />Redwood Shores <br />Redwood City, California <br /> <br />LEVEE CERTIFICATION <br /> <br />References: 1. ENGEO IncoIporated, "Preliminary Geotechnical Evaluation, Redwood City, <br />California;" April 27, 2009, Project No. 8585.000.000. <br /> <br />2. FEMA, "Fact Sheet, Requirements of 44 CFR Section 65.10: Mapping of Areas <br />Protected by Levee Systems;" May 2007. <br /> <br />Dear Mr. Trivedi: <br /> <br />As we discussed, we prepared this letter to summarize our opinion regarding eventual certification of <br />the levees surrounding the Redwood Shores development in Redwood City, California. The <br />requirements of levee certification are outlined in Title 44 of the Code of Federal Regulations Section <br />65.10 (44 CFR 65.10). Reference 2 provides a common-language summary of the salient points of <br />44 CFR 65.10, relevant to the engineering infonnation required for levee certification. As you know, <br />the certification of a levee must be completed by a registered Engineer who is certifying that the <br />seven criteria under subsection (b) of 44 CFR 65.10 are met by the subject levees. These seven <br />criteria are: <br /> <br />1. Freeboard <br />2. Closures <br />3. Embankment protection <br />4. Embankment and foundation stability <br />5. Settlement <br />6. Interior drainage <br />7. Other criteria (defined by FEMA for unusual situations and high wlnerability) <br /> <br />Criteria 4 and 5 are geotechnical issues that are discussed in our "Preliminary Geotechnical <br />Evaluation," for the Redwood Shores Levees (Reference 1). This report was prepared based on <br />the extensive previous explorations performed along the levees. These studies, listed in the <br />"Selected References" section to the report, were all perfonned by other consulting finns <br />between 1969 and 1997. These studies contain numerous borings that include shear strength <br /> <br />2010 Crow Canyon Place, Suite 250 · San Ramon. CA 94583. (925) 866-9000 · Fax (888) 279-2698 <br />www.engeo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.