Laserfiche WebLink
<br />City of Redwood City <br /> <br />Redwood Shores Lagoon/Belmont Slough Pump Station <br /> <br />FEES <br /> <br />We will perform the above tasks for the fixed fees presented in Table 1. Should any significant factor be <br />encountered other than as represented at the time of this proposal, such as difficulty in accessing the site <br />with our drilling equipment or adverse subsurface conditions, we reserve the right to adjust our fees in a <br />reasonable manner. Additional services requested by you that are not outlined in this proposal, such as <br />attendance at project meetings and preparation of draft reports, will be charged on a time-and-expense <br />basis. <br /> <br />Table 1 Project Fee Summary <br /> <br />Task Description Proposed Man-Hours Lump Sum Cost <br />1 Subsurface Exploration 16 $3,300 <br />2 Sample Review and Laboratory Testing 3 800 <br />3 Geotechnical Characterization and Report 20 2,400 <br /> <br />Total <br /> <br />39 <br /> <br />$6,500 <br /> <br />We have reviewed the City's standard agreement and can sign it if awarded the project. We have also <br />reviewed the insurance requirements and can meet the limits identified the standard agreement. <br /> <br />We look forward to working with you on this important project. Thank you for choosing us to assist you. If <br />you have any questions, please call and we will be glad to discuss them with you. <br /> <br />Sincerely, <br /> <br />TRC ENGINEERS, INC. <br /> <br />r;,;t1 m. €L <br /> <br />Scott M. Leek, P.E., G.E. <br />Principal Geotechnical Engineer <br /> <br />Copies: Addressee (1) <br /> <br />CTRC <br /> <br />Page 4 <br />172484 <br />