Laserfiche WebLink
the construction and Installation therein of three-inch. 0") plarit-mixed <br />aurfacj�u,,s 33,5 feet in width on. an el (8") orusher-run rock base <br />standard concrete curb, gutter w-id zidewalk an the Northeacstarly side thersofe <br />(6) The imps eve ment of Dover Road from Alameda do las Fulgas to <br />Crompton Roadj the liRprovement of Lwioaster Wwy from Viover Road 'to Jefferson <br />A. <br />Oak 124 d&o Urzi*�,we fr-ow-". <br />Avenuej the improvement of <br />Ave nae; aud too lukprovement of !)fsvon Way from Oak Ridge Drive to Jefferson <br />Avenue by the coastruction and iristallation therein of two-ino h (2") plant- <br />mixed surfacing 31 feet in width on a sIx-Inch (6 crusher -run rock base,# <br />standard oon ere ts curb, gutter sidewalk and drivewaj approachos on each <br />side thereof* <br />(7) The oonotruction and Installation therein of the pavin at all <br />Intersections as nee essary to conform with existing paviong and the raising <br />and loworing of all catchbasin manhole monumnt, valve and eleiuiaut frames <br />and oovers etc o to conform to the gra4as established hereln,, and the <br />oonstr cacti on of all necessary{ appurtenances therato,& <br />(6) The removal of all treea, curb-sp gutterz sidewalks,, structures, <br />walls, fenaeop driveways aleanouts headera and all other obstructions in <br />tiie line of -the work* <br />(9) The construction and installation of a fifteen (1511) rein- <br />forced concrete pipe from. an existing catchbasin on the Westerly side of <br />Jefferoon Avenue opposite Dover Road, to a reinforced concrete catehbasin <br />to be constructed at the Northeasterly corner of the intersection of <br />Jefferson Avenue and Dover Road; the reconstruction of the reinforced <br />eonarete catch-basin on the Easterly side of Jefferson Avenue between Dover <br />Road and Down Way; and the construction of a standard reinforced catch-basin <br />on the Southerly side of Jefferson Avonue at to 9+67 together with all <br />appurtenances necessary to complete the sme, <br />(10) jUs oast action. imid installation of concrete monuments including <br />standard frames and covers at intersections of the centerline of streets* <br />(11) The eonstruction and Installation of all work and the furnisUing <br />of all materials 'ne coo a ary therefor auxiliary to aay of the work provided to <br />be done in section I - 10 inclusive hereof whieh may reasonably be "quired <br />to carry Out the same. <br />