Laserfiche WebLink
<br />FOIlIlEFEIlENCE <br /> <br />5) Speed Indicator calibrated in percent of full speed. <br />6) Motor Run indicating light. <br />7) Motor Overtemperature indicating light. <br />8) Controller Failure Indicating light. <br />9) External operating handle for the incoming line circuit breaker. <br />10) Cabinet overheat indicating light. <br />11) Elapsed time meter. <br />b. Components: Mount components on circuit cards or modules that can be <br />adjusted or replaced In the field without the use of special tools. <br /> <br />I. Factory Test: <br />1. Subject VFD and motor control to a complete simulated operational test. Drive <br />a calibrated load at various speeds over the specified speed range to determine <br />VFD efficiency. <br />2. Submit certified test report to the Construction Manager before equipment is <br />shipped. <br /> <br />J. Spare Parts: Furnish two sets of spare power fuses for each size and type of fuse <br />used; furnish a minimum of five fuses of each size and type of control circuit fuse. <br /> <br />PART 3 ~ EXECUTION <br />3.01 INSTALLATION <br /> <br />A. Installation shall be In conformance with Section 16010. <br /> <br />B. Provide the services of a factory trained service technician to Inspect and check out <br />each system before energizing. <br /> <br />C. Lace power conductors to resist short circuit forces. Follow manufacturer's <br />Instructions. <br /> <br />3.02 FIELD TESTING <br /> <br />A. Provide the services of a factory trained service technician to make final <br />adjustments to equipment and carry out a full operational test in the presence of the <br />Construction Manager. <br /> <br />B. Replace any failed or damaged parts at no cost to Owner. <br /> <br />C. Following installation and manufacturer's field test, perform a field test under utility <br />and standby operating conditions. Operate the drive from no load to full load and <br />perform a spectrum analysis to verify that the waveform on motor control bus is In <br />compliance with IEEE 519 for general systems. Submit a complete certified test <br />report for review by the Construction Manager. If compliance has not been attained, <br />provide additional equipment as specified herein and perform the test again. <br /> <br />~_. <br /> <br />Shop Drawing Preparation Package <br />0988015.00 <br />C Kennedy/Jenks Consultants 2009 <br /> <br />Page 5 of6 <br /> <br />Variable Frequency Drives (VFD) <br />