My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Transmap Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Transmap Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2010 3:38:17 PM
Creation date
2/22/2010 11:41:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Transmap Corporation
PROJECT NAME
Rigth of Way Asset Inventory
RMP File Number
304.5
Date
2/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Transmap Corporation <br /> <br />A) Project Speclftcatlons/Raw Data Creation <br /> <br />Task <br />1 <br /> <br />City of Redwood City, CA Umlted Roadway Asset Pricing <br />164 Miles <br /> <br />February 4, 2010 <br /> <br /> <br />2 <br /> <br />Transmap Project Management <br /> <br />Transmap Redwood fee. Covers all visits, conference <br />calls, etc. - kick off, wrap up, Web-site project tracking <br />(deliveries), Progress Reports <br />Urban/Suburban Collection - Paved - 360 degree view of <br />roadways <br /> <br /> I-I <br />1 $20,000 $20,000 <br />1 $4,279 $4,279 <br />164 $139 $22,796 <br /> $29,075 <br />164 $35 $5,740 <br /> $5,740 <br /> <br />3 <br /> <br />ON-SIGHT"u1Raw Data Collection <br />(units = Centerline Miles) <br /> <br />B) Unear Reference System Creation <br /> <br />Task <br />1 <br /> <br /> <br />! Desair>tlon <br />Linear Reference System <br /> <br />Task <br /> <br />C) Asset Creation Options <br /> <br /> <br />Data will be delivered in Geodatabase and ArcServer web <br /> <br />!~QtfOn <br />Roadway Asset Inventory (units = <br />centerline mile) <br /> <br />Traffic Point Infrastructure -Signs, <br />Pavement/Curb Markings, Crosswalks <br />(units = centerline miles) <br /> <br />2 <br /> <br />Linear Infrastructure (units = <br />centerline miles) <br /> <br />Subtotal <br /> <br /> <br />~.....~ <br />Created in Feet. Needed to determine left and right side <br />of road and mileoost beain and end for Iinears <br />Subtotal <br /> <br />Includes Standard Attributes Sign-MUTCD, Face <br />direction, Post Type, Condition, Flashers, Markings-Type, <br />Color, Condition Crosswalks-Type, Condition All condition <br />is based on (Good, Fair, Poor) evaluations <br /> <br />Includes Standard Attributes/ Sidewalk Type (concrete, <br />paver,asphalt,other,none-LRS needed) <br /> <br />164 <br /> <br />$103 <br /> <br />$16,892 <br /> <br />$57 <br /> <br />$9,348 <br /> <br />164 <br /> <br /> <br />3 <br /> <br />GIS Integration (units = hours) <br /> <br />Assets linked to existing data sets - Centerline <br /> <br />$99 <br /> <br />$1,584 <br /> <br />16 <br /> <br />D) Image Viewer <br /> <br />Task <br />1 <br /> <br />i Desa1Pt1On <br />ArcGIS Server Web-Based Image <br />Viewer (lump sum) <br /> <br />Subtotal <br /> <br />$27,824 <br /> <br /> <br />COmmentS <br />Transmap will set up the the City of Redwood City to <br />view all collected images in ArcGIS Server web <br />environment with the sign data, Pavement Markings, <br />Orthoohotoaraohv and GIS basemao laver. <br />Subtotal <br /> <br />$1,744 <br /> <br />$1,744 <br /> <br />1 <br /> <br />$1,744 <br /> <br />· ...-,::2W ~. · · J...:J ~ 1llJ:,;. . ..:!.. <br /> <br />Total Project cost <br /> <br />$59,383 <br /> <br />Transmap will bill monthly project task percent complete with Invoices being net 30 tenns <br /> <br />Transmap Corporate Office <br />1156 Dublin Road, Suite 102 <br />Columbus, OH 43215 <br />(V)614-481-6799 (F)614-481-4017 <br />www.transmap.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.