My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-03-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-03-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2010 2:43:38 PM
Creation date
3/4/2010 1:12:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
3/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1D <br />Page 15 <br /> <br />fNVIRONb\fN1 ^l <br />V I S ION <br /> <br />2550 NINTH STREET <br />SUITE 205 <br />BE RKElEY CA 9A710 <br />510.5AO.,4882 <br />FAX SlO.5AO.1154 <br /> <br />Proposal- Shadow Diagrams <br />Stanford Development- Redwood City, CA <br />April 22, 2009 <br /> <br />Scope of Work <br /> <br />Task 1: Data Review and Site Reconnaissance <br />Review pertinent project data and conduct a site visit to observe the project site and <br />surroundings. Prior to the site visit, consult with City staff to determine location of <br />potentially sensitive shadow receptors. <br /> <br />Task 2: Shadow ImDact Dlaarams <br />Environmental Vision will produce shadow Impact diagrams for the proposed project. <br />Shadows for three times of day will be shown at four times of year: Winter and summer <br />solstices (December 21 and June 21), when the sun Is at its lowest and highest, and spring <br />and fall equinoxes (March 21 and September 2 t ), when day and night are of equal length. <br />A total of 12 black and white diagrams showing existing and future (with project) shadow <br />pattems will be produced. The diagrams will be based on computer modeling of shadow <br />effects associated with the proposed building massing. <br /> <br />Task 3: Coordination <br />Coordinate with project team and City staff to obtain and provide pertinent information in a <br />timely fashion. <br /> <br />Data Requirements- Both digital (CAD) and hardcopy format, are requested <br />. Existing site topography and proposed grading with property lines; <br />. Proposed site plan showing building footprint, driveways etc.; <br />. Floor plan and elevations drawings for proposed building; <br />. Building roof plan; <br />. Map of the surrounding areashowing existing building footprints with building heights; <br />. Aerial photograph of site and surrounding area; and <br /> <br />Budget Estimate <br />The estimated cost to complete the work outlined above including site photography, visual <br />simulations, and shadow diagrams is $5,200 including labor and expenses. <br /> <br />ENVIRONMENTAL VISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.