My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Green Environment
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Green Environment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 10:50:59 AM
Creation date
3/8/2010 11:55:29 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment
PROJECT NAME
GEI Project "On Broadway"
RMP File Number
304.5
Date
3/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT ~ <br /> <br /> <br />Green . <br />Environment Inc. <br />www.veenenvlronment.ccm <br /> <br />195 Glenn Way. Suite 250 <br />San Carlos. CA 94070 <br />T 650.508.8018 <br />F 650.508.8176 <br /> <br />GREEN ENVIRONMENT INC. PROPOSAL <br />GEl PROJECT #: R10590 <br /> <br /> <br />Name: City of Redwood City <br />Address: 1017 Middlefield Rd. <br />Redwood City, CA 94063 <br /> <br />Same <br /> <br />"On Broadway" <br />850 Jefferson A ven ue <br />Redwood City, CA <br /> <br />Contact: Brian Lee, Supervisory Civil <br />Engineer <br />(650) 780-7391 <br /> <br /> <br />Proposal Date: 12/16/09 <br /> <br />Prepared By: E. Ackerman <br /> <br />Task 1: Monthly Monitoring and Quarterly Reporting $22,800 <br />GEl will conduct monitoring of the treatment system from January 2010 through December 2010. GEl <br />will collect groundwater samples for subsequent laboratory analyses as per the attached table. <br />GEl will prepare a draft Quarterly Monitoring Report as per NPDES permit requirements, for the City's <br />review, prior to report finalization and submittal to the RWQCB. The report will be uploaded to <br />Geotracker in pdf format. GEl will provide a pdf version of each final report to the City. Each report will <br />include a letter of transmittal, a compliance evaluation summary, a location map, the results of analyses <br />and observations, data on flow and mass removed, and operational status. The fourth quarter report will <br />be an Annual Report covering the previous calendar year. In addition to the quarterly report <br />requirements, the annual report will contain a comprehensive discussion of the compliance record and <br />any corrective actions necessary. To be billed monthly in equal increments of $1,900. <br /> <br />Task 2: Additional sampling as required due to operational issues or as requested by the City or <br />RWQCB. Changeout of particulate filters, attendance at meetings, or other tasks as requested by the $3,000 <br />City or RWQCB. To be billed on a time and material basis as per the attached 2009 Schedule of <br />Charges, with a Not-to-Exceed cost of $3,000 <br /> <br />TOTAL LUMP SUM D or ESTIMATED [gJ PRICE $25,800 <br /> <br />Agreement: The Agreement between GEl and Customer will consist of this executed Proposal, and The General Terms and Conditions <br />of the Agreement between GEl and the Customer (General Terms). The General Terms, which are attached and made part of this <br />Proposal, are specifically made part of any agreement between GEl and the Customer. <br /> <br />Si nature <br /> <br />Title <br /> <br />~_/- <br />Date <br /> <br />Customer: <br />
The URL can be used to link to this page
Your browser does not support the video tag.