My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 All Fence Company
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 All Fence Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 3:39:45 PM
Creation date
3/8/2010 11:58:28 AM
Metadata
Fields
Template:
Agreement
Contractor Name
All Fence Company
PROJECT NAME
Fence for Phil Shao Memorial Skate Park
RMP File Number
304
Date
2/4/2010
MO Ref
10-004
Sticky Note
ID:
1
Text:
Payment bond pages 8-11
Faithful performance bond pages 12-14
Notice of Completion pgs 15-16
MO 10-122 pg. 17
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California (hereinafter referred to as "City") and ALL FENCE COMPANY, INC., located at 1900 <br />Spring Street, Redwood City, California, 94063-4559 (hereinafter referred to as "Contractor") <br />(collectively, the "Parties"), for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br />of the labor, equipment, materials, and tools to perform, within Sixty (60) calendar days <br />after the NOTICE TO PROCEED, the following work: <br /> <br />SKATEPARK FENCE PROJECT AT RED MORTON PARK <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the Manager, Engineering and Construction of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if herein fully <br />set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by Contractor <br />of the aforementioned work, the amount of Seventy nine thousand seven hundred thirty <br />two and 00/100 Dollars ($79,732.00) computed in accordance with Contractor's accepted <br />Proposal dated, November 18, 2010, which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, City or its authorized representative, and the work shall be done in the best <br />workmanlike manner, conforming strictly to the provisions of the specifications and plans <br />made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shall, as a <br />penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed <br />in the execution of the Contract by Contractor or by any subcontractor for each calendar <br />day during which such worker is required or permitted to work more than eight (8) hours <br />in anyone (1) calendar day and 40 hours in anyone (1) calendar week, unless such <br />worker receives compensation for all hours worked in excess of eight (8) hours at not less <br />than 1-1/2 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial Relations. <br />Pursuant to the provisions of California Labor Code Section 1773.2, Contractor is hereby <br />advised that copies of the prevailing rate of per diem wages and a general prevailing rate <br />for holidays, Saturdays and Sundays and overtime work in the locality in which the work is <br />to be performed for each craft, classification, or type of worker required to execute the <br />Contract, are on file in the office of the City Clerk, which copies shall be made available to <br />any interested party on request. Contractor shall post a copy of said prevailing rate of per <br />diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay travel <br />and subsistence payments to each worker needed to execute the work, as such travel and <br />subsistence payments are defined in the applicable collective bargaining agreements filed <br />in accordance with this Section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.