My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 G & E Engineering Systems Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 G & E Engineering Systems Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2010 11:07:12 AM
Creation date
3/9/2010 10:58:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
G & E Engineering Systems Inc
PROJECT NAME
Consulting Services
RMP File Number
304
Date
2/25/2010
MO Ref
10-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Seismic Vulnerability Study <br /> <br />. <br /> <br />Rate Schedule, Reimbursable Expenses and Payment <br /> <br />G&E ENGINEERING SYSTEMS INC. <br />RATE SCHEDULE 2009 <br /> <br />Effective Through December 31, 2009 <br /> <br />Engineering Rate Schedule, G&E Staff (Regular and Overtime Hours) <br /> <br />John Eidinger <br />Donald Duggan <br />Ken Goettel <br />Darlene Holston <br />Susan Chao <br />Engineer ~ <br />Admin ^ n\O ~. <br />'v I... /, <br /> <br />Labor costs include salary L ~ges, overhkd, general and administrative, and profit. Labor costs are valid <br />through December 31, ~and increase by 4% for the twelve months following. Rates for subsequent <br /> <br />$220.00 <br />$190.00 <br />$190.00 <br />$170.00 <br />$170.00 <br />$150.00 <br />$75.00 <br /> <br />calendar years are subject to annual changes. <br /> <br />Reimbursable Expenses <br /> <br />a. Mileage at IRS approved rates per mile within the San Francisco Bay Area. <br /> <br />b. Expenses of travel, subsistence and communications outside of the San Francisco Bay Area, in <br />connection with the Project. Air travel will be by coach rates. <br /> <br />c. Expense of the reproduction and messenger delivery of project work and other documents. <br /> <br />d. Expense of outside services including sub-consultants, mock-ups, models, special drafting, display <br />renderings, graphic art work, and photographic work at cost plus 10%. <br /> <br />e. Expense of special supplies and materials. Color print media shall be charged at $0.75 per sheet (A size) <br />or $1.50 per sheet (B size) or $2.00 per square foot for large format sizes (D or E size). Large format CD or <br />E size) black and white drawings shall be charged at $1.00 per square foot. <br /> <br />f. Expense of computers. Computer costs include rates for computer-based CAD drafting. No charge for <br />computers used for word-processing or other overhead activities. For drafting work performed on G&E <br />computers, billing rates are $7 per hour. <br /> <br />October 9,2009 <br /> <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.