Laserfiche WebLink
<br />. . . <br /> <br />A S. S Q C l: ATE 5 <br /> <br />~. . <br /> <br />A, SCOPE OF WORK: <br /> <br />Professional Services to Include but not limited to <br /> <br />a) Preliminary Design: Provide preliminary design drawings to review to <br />City and User. Adapt design as required following meeting. (6 Hours) <br /> <br />b) Construction Documents: (40 Hours, 20 Hours x $80 and 20 Hours x $120) <br /> <br />c) Structural Engineering: (6 Hours x $150 Consultant Fee, no mark-up) <br /> <br />d) Agency Submittal: Review and respond to comments (4 Hours) <br /> <br />e) Bidding: Answer RFI's, prepare addena, project manual, etc. (6 Hours) <br /> <br />f) Construction Administration: .Attend (4) on site construction meetings, <br />answer RFJ's, provide punch list, prepare close-out documents. (8 Hours) <br /> <br />g) Items I Services Not Included In Proposal <br />1. Electrical, Mechanical, Plumbing Engineering <br />2. Geotechnical Engineering. <br />3. T24 Calculations <br /> <br />'5008 ph.408.370.9860 fx.408.370.9861 <br />