My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 City and County of San Francisco SFPUC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 City and County of San Francisco SFPUC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 8:07:30 AM
Creation date
5/4/2010 2:18:13 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SF Public Utilities Commission
PROJECT NAME
Bay Division Pipeline No. 5 Project
RMP File Number
304
Date
3/30/2010
Reso Ref
14996
MO Ref
10-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Quartz Street P1-70 <br />SFPUC Engineering <br />July, 2009 <br />All construction, including restoration, shall occur during a single <br />Management Bureau <br />season, between June 15 and August 15 only. CCSF's Contractor <br />shall allow access to residences along Avenida Del Ora during non - <br />work hours, and emergency access during work hours, and place <br />SFPUC Engineering <br />STA 333+50 <br />to Road Closed Ahead signs at each end of the block. Pipeline <br />Avenida Del Ora <br />P1-689 P1-69 July, 2009 <br />Management Bureau <br />STA 338+25 <br />installation shall occur between 7:30AM to 4:30PM, M -F, when the <br />James Avenue P1-71 <br />SFPUC Engineering <br />July, 2009 <br />road may be closed. Any affected areas of paving and sidewalks <br />Management Bureau <br />shall be restored per Redwood City standards. <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Avenue Del Ora. <br />SFPUC Engineering <br />Construction work in front of John Gill Elementary shall occur <br />John Gill Elementary <br />P1-68, P1-69 SFPUC Engineering July, 2009 <br />STA 333+50 <br />to between June 15 and August 15. Any affected areas of paving and <br />School <br />Management Bureau <br />STA 338+25 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />Topaz P1-73 <br />SFPUC Engineering <br />July, 2009 <br />when the road may be closed. Any affected areas of paving and <br />South Place <br />P1-69 Management Bureau July, 2009 <br />STA 339+40 <br />sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Quartz Street P1-70 <br />SFPUC Engineering <br />July, 2009 <br />STA 345+90 sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Quartz Street. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />James Avenue P1-71 <br />SFPUC Engineering <br />July, 2009 <br />STA 350+50 sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in James Avenue. <br />Pipeline installation shall occur between 7:30AM to 4:30PM, M -F, <br />SFPUC Engineering <br />when the road may be closed. Any affected areas of paving and <br />Harding P1-72 <br />Management Bureau <br />July, 2009 <br />STA 356+10 sidewalks shall be restored per Redwood City standards. <br />Pipeline installation shall occur between 9:OOAM to 4:OOPM, M -F, <br />when the road may be closed. Any affected areas of paving and <br />Topaz P1-73 <br />SFPUC Engineering <br />July, 2009 <br />STA 361+10 sidewalks shall be restored per Redwood City standards. <br />Management Bureau <br />CCSF's Contractor shall conduct closed circuit television (CCTV) <br />inspection of 6 -inch existing sewer pipe which crosses the new <br />proposed pipeline in Topaz Street. <br />Construction shall occur in one of three ways, mutually exclusive: <br />Alameda De Las Pulgas P1-74 <br />SFPUC Engineering <br />Management Bureau <br />July, 2009 <br />STA 364+30 1. During normal weekdays (M -F), between9:00AM to 4:OOPM <br />M -F, with on lane open during this period, and two lanes <br />open at all other times. <br />B-5 Redwood City MOA 100318 PD JLO RH FINAL DOCRedweed City NIGA 100309 PD PLO RKDOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.