My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-05-24 special, clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-05-24 special, clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 3:06:28 PM
Creation date
5/20/2010 2:08:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council and Redevelopment Agency
Date
5/24/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2C <br />Page 1 <br />REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />May 24, 2010 <br />SUBJECT <br />Final Acceptance -Middlefield Road In-Roadway Warning Light System <br />RECOMMENDATION <br />Accept, by motion, the Middlefield Road !n-Roadway Warning Light System Project and <br />authorize the release of bonds and retention according to the City's procedures. <br />BACKGROUND <br />On August 24, 2009, Council awarded the construction contract for the Middlefield Road <br />In-Roadway Warning Light System Project to Republic ITS, Inc of Fremont. The work <br />for this project included the installation of warning lights embedded into the roadway <br />surface, pedestrian detection bollards, new street lights, concrete improvements, <br />pavement striping, and pedestrian warning signage. This project has helped to facilitate <br />pedestrian crossings at the mid-block crosswalk on Middlefield Road between Jefferson <br />Avenue and Main Street. <br />The project was awarded for a base bid of $118,875.00. The project was successfully <br />completed in accordance with the plans and specifications. One {1) change order <br />totaling $5,206.95 was issued. The final contract amount is $124,081.95 which is 4.4% <br />more than the initially awarded contract amount. The change order resulted from <br />quantity adjustments and unforeseeable conditions encountered during construction. <br />Unanticipated work included relocation of the street light poles due to utility conflicts, <br />replacement of damaged sections of sidewalk, curb and gutter, and installing additional <br />wires for the street lights. <br />ALTERNATIVES <br />Council may choose not to accept the project andlor not to authorize the release of <br />bonds and retention which would be contrary to the terms of the contract, prior Council <br />action, and the public contracting code. <br />FISCAL IMPACT <br />Sufficient funding for this construction contract was previously appropriated as Gas Tax <br />Construction Fund -Middlefield Road Improvements. Staff has also previously secured <br />grant funds totaling $64,860.00 from the Metropolitan Transportation Commission to <br />supplement the construction cost. <br />Pe er Delgado <br />Associa#e Engineer <br />:~ } <br />L'~nn~. <br />Chu Chang, PE, LEED A <br />Building, Infrastructure, and <br />Transportation Director <br />ATTACHMENTS <br />None <br />~~ <br />S. P ter Vorametsanti, PE, PTOE, CFM <br />City ngineer <br />~ r <br />~~~ ~~~ <br />Peter I gram ~ <br />City Manager <br />RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br />None <br />
The URL can be used to link to this page
Your browser does not support the video tag.