My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Hauge Brueck Associates, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Hauge Brueck Associates, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 8:33:48 AM
Creation date
6/1/2010 2:26:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Hauge Brueck Associates, LLC
PROJECT NAME
Environmental Consulting Services for the Saltworks Develpoment Proposal
RMP File Number
304
Date
6/1/2010
MO Ref
10-094,10-165, 11-069
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. . <br /> <br />~ . <br /> <br />Task 4 <br /> <br />Environmental Section Outlines <br /> <br />The purpose of this task is to capture and record appropriate information to be used in the subsequent <br />phases of the project. Outlines of the identified sections shall be used to document the collected <br />information. The outline shall reference reports, minutes, and memoranda that provide information <br />and details not appropriate for an outline. <br /> <br />4.1 Project Description Outline <br /> <br />The ECT shall prepare an outline of the Project Description. The Project Description is to include but <br />not be limited to land ownership, dimensions of facilities, acreage, descriptions of facilities, staging <br />areas, phasing, population, employment, construction practices, operations, sustainability practices, <br />public services to be provided and utility and transportation improvements. <br /> <br />4.2 Project Objectives, Purpose, and Need Outline <br /> <br />The City shall provide the ECT with sections of the General Plan that identify the City's objectives, <br />purpose, and need. The Applicant shall provide their statement of objectives, purpose, and need. <br />Using the provided documents, the ECT shall prepare a draft outline of the Project Objectives, <br />Purpose, and Need. <br /> <br />4.3 Affected Environments and Study Area Outline <br /> <br />The City and Applicant shall provide the ECT with relevant technical studies, reports, and graphics <br />related to the potential study area of the Project. The ECT shall review the documents to identify the <br />affected environmental areas, potential study area, and data gaps. <br /> <br />4.4 Mapping of Study Area <br /> <br />The ECT shall assemble available mapping of the affected resources using the studies, reports, and <br />graphics provided by the City and Applicant. <br /> <br />4.5 Track Project Alternatives <br /> <br />The ECT shall prepare a Project Alternatives Outline to track potential alternatives. <br /> <br />4.6 City Plans and Policies <br /> <br />Working with the City, the ECT Program Manager and Assistant Program Manager shall review the <br />available documentation and process status of the City plans and policies. The purpose of this <br />activity is to ensure the Project and City plans and policies are coordinated. <br /> <br />4.7 Environmental Thresholds <br /> <br />The ECT shall begin to assemble environmental thresholds from the City's General Plan, previous <br />environmental documents, and federal, state, and local regulations. <br /> <br />4.8 Environmental Analysis Methodology <br /> <br />The ECT shall begin to assemble environmental analysis methodologies usmg prevIOUS <br />environmental documents, and federal, state, and local guidelines. <br /> <br />4.9 Project Setting <br /> <br />The ECT shall begin to assemble text and graphics that describe the existing project setting. <br /> <br />Saltworks Environmental Program Task Order No. 001 <br /> <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.