Laserfiche WebLink
Braced wall panel sole plates shall be nailed to the floor framing and top <br />plates shall be connected to the framing above in accordance with Table 23-11-B- <br />1. Sills shall be bolted to the foundation or slab in accordance with Section <br />1806.6. Where joists are perpendicular to braced wall lines above, blocking shall <br />be provided under and in line with the braced wall panels. <br /> <br /> "Section 9.46. Section 421.1, Item 5; 421.2; Appendix Chapter 4, <br />Division 1 of Building code deleted: Sections 421.1, Item 5 and 421.2, Appendix <br />Chapter 4, Division I of the Building Code are hereby deleted and shall have no <br />force or effect in the City." <br /> <br /> "Section 9.47. Section 3310, Appendix Chapter 33 of Building Code <br />amended: Section 3310, Appendix Chapter 33 of the Building Code is hereby <br />amended to read as follows: <br /> <br /> "'Section 3310. GradinR Fees. At the time of filing for a grading permit, <br />the applicant shall deposit funds to cover the costs of plan checking. Prior to <br />plan approval, additional fees shall be deposited to cover the costs of inspection. <br />The plan checking and inspection deposit amounts and City costs shall be <br />established by resolution of the City Council. Separate plan review and permit <br />fees shall apply to retaining walls or major drainage structures as required <br />elsewhere in this code.'" <br /> <br /> "Section 9.48. Appendix Chapter 33 of Building Code amended: <br /> <br />Appendix Chapter 33 of the Building Code is hereby amended to insert the <br /> <br />ORD-001 7 <br />FXS:jtl:rnkc <br />6/1/99 2165 <br /> <br /> <br />