My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-06-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2010 10:47:25 AM
Creation date
6/24/2010 3:32:12 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
6/28/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1A <br />Page 25 <br /> <br />Ca.e. <br /> <br />Peninsula Corridor Joint Powers Board (pCJPB), P. o. Box 3006 (1250 San Carlos Ave.), San Carlos, CA 94070-1306, <br />Engineering Deparbnent, (650) 508-7968, FAX (650) 508-7967 <br />SITE SPECIFIC WORK PLAN (SSWP) APPLICATION <br /> <br />JPB Proj ect #: <br /> <br />SSWP Submittal #: <br /> <br />SSwr APPLICATION <br />APPLICANT: <br />ADDRESS: <br /> <br />E-mail Address: <br /> <br />TELEPHONE: <br />LOCATION of PROJECT <br />PROJECT SITE CONTACT: <br />DA TE(S):REQUESTED: <br /> <br />FAX:; <br /> <br />DAILY WORK HOURS REQUESTED: <br /> <br />CLEARANCE TO NEAREST RAIL OF OPERATING TRACK: <br />DESCRIPTION OF WORK TO BE PERFORMED:. <br /> <br />EQUIPMENT TO BE USED IN THE CONSTRUCTION: <br /> <br />EXCAVATION WITHIN THE RAILROAD ZONE OF INFLUENCE: <br />IF SO APPROVED SHORING ATIACHED: <br /> <br />~ <br />YESTI <br /> <br />~ <br />NOD <br /> <br />SAFETY CONSIDERATIONS: <br /> <br />All personnel working on project shall be JPB RWP Safety Trained per FRA Regulations <br /> <br />NOTE: <br />1. RETURN COMPLETED FORM TO THE PCJPB, FAX (650) 508-7967, BY 4:00PM ON TUESDAY THREE <br />WEEKS PRECEEDING WORK (EVERY WEEK, WEEKS BEGIN ON MONDAY) IN ORDER TO <br />SCHEDULE INSPECTION AND/OR FLAGMEN. <br />2. WORK REQUIRING SHORING MUST INCLUDE ALL SHORING DRAWINGS STAMPED AND <br />APPROVED BY A REGISTERED CIVIL ENGINEER AND BEAR THE APPROVAL OF THE JPB. <br />3. FAILURE TO COMPLETE THIS FORM ACCURATLEY MAY BE CAUSE FOR THIS PROJECT TO BE <br />DELAYED OR SHUT DOWN. <br /> <br />APPLICANT NAME (pLEASE PRINT) <br /> <br />SIGNATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.