My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 A&F Engineeering, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 A&F Engineeering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2010 9:03:49 PM
Creation date
6/30/2010 9:03:47 PM
Metadata
Fields
Template:
Agreement
Contractor Name
A&F Engineeering, Inc.
PROJECT NAME
Maple Street Storm Drain Improvement Project
RMP File Number
304
Date
6/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ :' I <br /> <br />DUPlJGJl T[: <br />ORIGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />MAPLE STREET STORM DRAIN IMPROVEMENT PROJECT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California (hereinafter referred to as "Cityll) and A&F ENGINEERING, INC., of 410 MAPLE <br />STREET, REDWOOD CITY, California (hereinafter referred to as "Contractor") (collectively, the <br />ItParties"), for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br />of the labor, equipment, materials, and tools to perform, within Forty Five (45) calendar <br />days after the NOTICE TO PROCEED, the following work: <br /> <br />MAPLE STREET STORM DRAIN IMPROVEMENT PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the Manager, Engineering and Construction of Redwood City! which <br />Documents are incorporated herein and made a part of this Agreement as if herein fully <br />set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by Contractor <br />of the aforementioned work, the amount of Sixty thousand seven hundred eighty and <br />00/100 Dollars ($60,780.00) computed in accordance with Contractor's accepted Proposal <br />dated, May 19, 2010, which accepted Proposal is incorporated herein by reference thereto <br />as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, City or its authorized representative, and the work shall be done in the best <br />workmanlike manner, conforming strictly to the provisions of the specifications and plans <br />made thereof. <br /> <br />4. <br /> <br />(a) Contractor shall comply with all applicable provISions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shalll as a <br />penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker <br />employed in the execution of the Contract by Contractor or by any subcontractor for <br />each calendar day during which such worker is required or permitted to work more <br />than eight (8) hours in anyone (1) calendar day and 40 hours in anyone (1) calendar <br />week, unless such worker receives compensation for all hours worked in excess of <br />eight (8) hours at not less than 1-1/2 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Codel Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial <br />Relations. Pursuant to the provisions of California Labor Code Section 1773.2, <br />Contractor is hereby advised that copies of the prevailing rate of per diem wages and a <br />general prevailing rate for holidays, Saturdays and Sundays and overtime work in the <br />locality in which the work is to be performed for each craft, classification, or type of <br />worker required to execute the Contract, are on file in the office of the City Clerk, which <br />copies shall be made available to any interested party on request. Contractor shall <br />post a copy of said prevailing rate of per diem wages at each job site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.