Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />InterfaceSERVICES <br />1- - _.- ~_ ._.....__~ '.V -_ ,-. -", -=.",,".,,~~ ... ...~~ ~ ~ u - 1 <br />City of Redwood <br />Fairoaks Library <br />Overtime Labor <br />I -- - - - ~ I <br />~ ,.-.. - - <br />Interface Cologne Carpet Tile ( C-1 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 6963 Loam 53.82 $ 21.77 $ 1,171.66 <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 5.98 $ 21.77 $ 130.18 <br />.. ~ ~ - - - .. - <br />Interface Hanover Carpet Tile ( C-2 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 6758 Flax 251.16 $ 19.76 $ 4,962.92 <br /> ...------------- ----- -.- <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 17.94 $ 19.76 $ 354.49 <br /> .. - <br />Interface Psychadelic Carpet Tile ( C-3 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 1459 Hindsight 47.84 $ - 21.85 $ 1,045.30 <br /> - --- <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 5.98 ---1.. _ 21.85 $ 130.66 <br /> - - <br />Installation Of Carpet Tiles <br />Sin 31-604 352.82 $ 4.50 $ 1,587.69 <br /> -.--------- ---- ~ ----- . <br />Removal of existing carpet <br />(Open Market Line Item) 352.82 - $ 3.75 $ 1,323.08 <br /> --- <br /> ------ - <br />Supply and install Wall Base <br />(Open Market Line Item) 150 $ 2.25 $ 337.50 <br />Floor Prep - - <br />(Open Market Line Item) 8 ---1._ _ 85.00 $ 680.00 <br />~-- <br />TacTiles <br />(.2P.en Market Line Item) 3 $ 74.99 $ 224.97 <br /> - - <br />Overtime Labor <br />( Open Market Line Item ) 352.82 $ 9.00 $ 3,175.38 <br /> -- <br /> - <br />Bond <br />( Open Market Line Item) 1 $ 226.86 $ 226.86 <br />Ramp LF to existing ceramic tile <br />( Open Market Line Item) $ - <br /> Project Total $ 15,350.70 <br />Exclusions: <br />1. This proposal does not Include Major Floor Preperation. <br />2. IS will not be responsible for excessive sub-floor moisture or PH levels. <br />3. Installation is to occur during normal buisness hours. No Nights or weekends. <br />4. IS can not be responsible for the removal or disposal of any asbestos containing materials. <br />5. Should Asbestos be discovered Interface will discontinue the project untill the Government can make <br /> arrangements for the proper removal and disposal of said material. <br />6. Janitorial Services <br /> ., <br />