My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Interface Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Interface Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 4:33:07 PM
Creation date
7/20/2010 4:31:29 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Interface Services
PROJECT NAME
2010 Civic Facilities Carpet Replacement Project
RMP File Number
304
Date
3/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />InterfaceSERVICES <br />1- - _.- ~_ ._.....__~ '.V -_ ,-. -", -=.",,".,,~~ ... ...~~ ~ ~ u - 1 <br />City of Redwood <br />Fairoaks Library <br />Overtime Labor <br />I -- - - - ~ I <br />~ ,.-.. - - <br />Interface Cologne Carpet Tile ( C-1 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 6963 Loam 53.82 $ 21.77 $ 1,171.66 <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 5.98 $ 21.77 $ 130.18 <br />.. ~ ~ - - - .. - <br />Interface Hanover Carpet Tile ( C-2 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 6758 Flax 251.16 $ 19.76 $ 4,962.92 <br /> ...------------- ----- -.- <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 17.94 $ 19.76 $ 354.49 <br /> .. - <br />Interface Psychadelic Carpet Tile ( C-3 ) <br />50 x 50 Cm GlasBac Tile <br />SIN 31-303 <br />Color: 1459 Hindsight 47.84 $ - 21.85 $ 1,045.30 <br /> - --- <br />Attic Stock <br />Carpet tile ( see above) <br />Sin 31-603 5.98 ---1.. _ 21.85 $ 130.66 <br /> - - <br />Installation Of Carpet Tiles <br />Sin 31-604 352.82 $ 4.50 $ 1,587.69 <br /> -.--------- ---- ~ ----- . <br />Removal of existing carpet <br />(Open Market Line Item) 352.82 - $ 3.75 $ 1,323.08 <br /> --- <br /> ------ - <br />Supply and install Wall Base <br />(Open Market Line Item) 150 $ 2.25 $ 337.50 <br />Floor Prep - - <br />(Open Market Line Item) 8 ---1._ _ 85.00 $ 680.00 <br />~-- <br />TacTiles <br />(.2P.en Market Line Item) 3 $ 74.99 $ 224.97 <br /> - - <br />Overtime Labor <br />( Open Market Line Item ) 352.82 $ 9.00 $ 3,175.38 <br /> -- <br /> - <br />Bond <br />( Open Market Line Item) 1 $ 226.86 $ 226.86 <br />Ramp LF to existing ceramic tile <br />( Open Market Line Item) $ - <br /> Project Total $ 15,350.70 <br />Exclusions: <br />1. This proposal does not Include Major Floor Preperation. <br />2. IS will not be responsible for excessive sub-floor moisture or PH levels. <br />3. Installation is to occur during normal buisness hours. No Nights or weekends. <br />4. IS can not be responsible for the removal or disposal of any asbestos containing materials. <br />5. Should Asbestos be discovered Interface will discontinue the project untill the Government can make <br /> arrangements for the proper removal and disposal of said material. <br />6. Janitorial Services <br /> ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.