<br />~KF Engineers
<br />255 Shoreline Drive, Suite 200
<br />Redwood City, CA 94065
<br />
<br />July 12, 2010
<br />
<br />
<br />
<br />Unit Price
<br />- mi:soo.oO I
<br />
<br />Amount
<br />$1,500]
<br />$70,600
<br />
<br />Fire Water
<br />
<br />43 6" Double Check Detector Assembly 2 EA $ 7,500.00 . $15,000
<br />44 gtf Double Check Detector Assemblv 2 EA $ 10,000.00 $20,000
<br />45 Fire Department CQnnection 2 EA $ 2,000.00 $~.QQQ
<br />46 Wall Mounted Fire Department Connection 1 EA $ 2,000.00 $2,000
<br />47 Fire Hydrant 3 EA $ 2,000.00 $6,000
<br />48 6" Valve 8 EA ~ 1,500.00 $12,000
<br />49 8" Valve I 1 EA $ 1,500.00 . $1,500
<br />50 4" pve Pipe I 20 LF $ 40.00. $800
<br />5-1------ 61L PV-G-Pipe---...---------.-.-.-..--.-.-.-....--------..----.--.---.- ---------26(} I:;F-' .$---....-..----.60:00- ...-------~---$t5~600"
<br />52 8" PVC Pipe 370 LF $ 80.00 I $29,600
<br />53 Connection to (E) Fire Water Main 1 EA $ 1,500.00 $1.500
<br />
<br />$108,000
<br />
<br />Str~et Improvements
<br />
<br />154 Flush Curb . 190 LF .$ 12.00 $2,280
<br />55 Verticat Curb . 3,660 LF $ 15.00 $54,900
<br />S6 Curb and (,'utter 1,500 LF $ 25.00 $37,500
<br /> Sidewalk ~
<br />57 17,890 SF $- to.OO $178,900
<br />58 Curb Ramp 6 EA $ 1,000.00 $6,000
<br />59 Tree Well 4 EA $ 1AOO.00 $5.600
<br />60 Bollard 13 EA $ 500.00 56,500
<br />161 pce Pavement (8") 600 SY $ 45.00 $27,000
<br />62 Asphalt Concrete Pavement 1,750 TONI $ 100_00 $175,000
<br />63 Class 11 Aggrega~ Base Pavement -- 7,700 TONI $ 80.00 $616,000
<br />64 Wheel. Stop 9 EA 1$' 80.00 $720
<br />65 Signa~e 1 LS 1$ 30,000.00 $30,000
<br />66 I Striping 1 LS $ 30,000.00 $30,000
<br />
<br />$1,170,400
<br />
<br />Miscellaneous
<br />167 IErosion Control
<br />
<br />IlLS 1$
<br />
<br />50,000.00 I
<br />
<br />$50,0001
<br />$50,000
<br />
<br />SUBTOTAL
<br />15% Contingency
<br />
<br />$2,517,875
<br />$377,681
<br />
<br />TOTAL
<br />
<br />$2,895,556
<br />
<br />GENERAL NOTES
<br />1. This Opinion of Probable Construction Cost Estimate is based upon Site Improvement plans prepared by
<br />BKF dated July 9, 2010. .
<br />
<br />
<br />K:\MAJlo.'I2006\0600 j.4\o9 Cost Eu-QulIIitic:M Enainecrs Estill1lll= - QllIlDlil.i~mp'Q_1 Pla~\Bo~neera$lh\lat'L lP .xl.
<br />
<br />20F2