Laserfiche WebLink
�'IA-4 <br />January 9, 2003 <br />Mr. S. Peter Vorametsanti <br />Senior Civil Engineer <br />City of Redwood City <br />1017 Middlefield Road <br />P. O. Box 391 <br />Redwood City, CA 94064 <br />EXHIBIT "A" <br />RE: Revised Cost Proposal for Preconstruction Support Services <br />Ralston Interchange Project <br />Dear Peter: <br />Harris & Associater <br />Program Managers <br />Construction Managers <br />Civil Engineers <br />As requested the hourly billing rates have been revised by reducing the fee to 8.00% in lieu of <br />10 %, and the elimination of the 5.00% escalation fee. The following is a revised time and <br />materials cost proposal for preconstruction services on the Ralston Interchange: <br />Nabil Hissen, Project Manager: 50 hours <br />@ <br />$160.18/hour = <br />$8,009.00 <br />Sam Barjoud. Resident Engineer: 200 hours <br />@ <br />$152.71/hour = <br />$30,542.00 <br />Roberto Sequiera, Assistant RE: 200 hours <br />@ <br />$96.12/hour = <br />$19.224.00 <br />TOTAL <br />$57.775.00 <br />The scope of anticipated services includes the following: <br />• Biddability /Constructibility Review <br />• Schedule evaluation and review <br />• Construction scope review <br />• Interface with designer <br />• Prebid support <br />Thank you for your cooperation in this matter. Please feel free to call me if you have any <br />questions or require further information. <br />Sincerely, <br />I�ARRIS & ASSOCIATES, INC. <br />QC � <br />Nabil H. isse — ,P - E <br />Project Manager <br />120 Mason Circle Concord, California 94520 -1214 925.827.4900 FAX 925.827.4982 concord @har6s- assoc.com <br />