My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-08-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-08-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2010 4:17:37 PM
Creation date
8/5/2010 2:11:14 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/9/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O.Lt:S <br />Page 49 <br /> <br />ATTACHMENT 4 <br /> <br />EXHIBIT A <br /> <br />. Any planning, design, review fees, permit, inspection, construction <br />observation, overhead, as built drawings; and other third party costs to <br />include entities controlled by a public utilities commission and the like <br />associated with the construction and completion of the facilities ; <br /> <br />. Any and all facilities to be located within public utility easements, which <br />easements are dedicated to the City; or for the benefit of the 'lpublic," or <br />flood control improvements to include but not be limited to: <br /> <br />. Fill and bank improvements; <br /> <br />. On site parks and appurtenances; <br /> <br />. Boat launches; <br /> <br />. Outer Esplanade; <br /> <br />. Village Walk; <br /> <br />. Potable water lines and appurtenances; <br /> <br />. Sanitary sewer lines and appurtenances; and <br /> <br />. Storm sewer lines and appurtenances including bio-swales <br /> <br />3. Affordable Housina contributions as reQuired bv the City <br /> <br /> <br />4. Costs associated with the South Bavside System Authority <br /> <br />To the extent not already stated above, the facilities to be financed may include <br />the costs of the acquisition of right-of-way (including right-of-way that is intended to be <br />dedicated by the recording of a final map), the costs of design, engineering and <br />planning, the costs of any environmental or traffic studies, surveys or other reports, <br />costs related to landscaping and irrigation, soils testing, permits, plan check and <br />inspection fees, insurance, bonding, legal and related overhead costs, coordination and <br />supervision, relocation of existing facilities, and any other costs or appurtenances <br />related to any of the foregoing facilities or other incidental costs, whether performed <br />prior to or after the formation of the District. <br /> <br />OTHER <br /> <br />The CFD may also finance any of the following: <br /> <br />1. Bond related expenses, including underwriters discount, appraisal fees, <br />reserve fund, capitalized interest, letter of credit fees and expenses, financial advisor <br />fees and expenses, bond and disclosure counsel fees and expenses, fees and <br />expenses of the City Attorney, bond remarketing costs, and all other incidental <br />expenses. <br /> <br />2. Administrative fees of the City and the Bond trustee or fiscal agent related to <br />the CFD and the Bonds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.