My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 San Mateo Co, Peninsula Corridor Joint Powers Board (JPB) , San Mateo Co. Transit District (SamTrans)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2010 4:19:11 PM
Creation date
8/6/2010 3:41:34 PM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo County
PROJECT NAME
License Agreement 800520
RMP File Number
304
Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3. Hardhats <br /> <br />· Hardhats may be of any style but must meet ANSI standards and be worn at all times while <br />working on the PCJPB right of way. (Exception: Transportation employees performing passenger <br />service.) <br /> <br />4. Shoes/Height/Toe <br /> <br />· Appropriate shoes must be worn for each type of work. Shoes must have adequate ankle support <br />and a sturdy sole. Tennis shoes, jogging shoes, sport shoes, and open toe shoes are prohibited. <br />Steel-toed or safety-toed approved boots with sufficient ankle support (6-inch min. 8-inch. <br />recommended) are recommended at construction sites. <br /> <br />(Exception: Transportation employees involved in passenger service and persons whose jobs call for flat <br />sole shoes such as paving crews.) <br /> <br />In order for this policy to be enforceable, each agency, department, contractor, and consultant shall <br />arrange for easy access to required PPE. Each agency, department, contractor, and consultant will decide <br />individually decide on the method for issuing PPE. <br /> <br />III. Roadwav Worker Protection Infractions <br /> <br />Consequences of Non-compliance <br /> <br />Individuals who are determined to be non-compliant with RWP or PPE shall be subject to the following <br />consequences: <br /> <br />· First infraction - individual or work group will be asked to clear foul zone. A written warning <br />shall be delivered to the appropriate individual, the individual's supervisor and appropriate <br />lPB manager as stated above. <br /> <br />· Second infraction - 24 hours banned from the Caltrain right-of-way with re-training within <br />seven (7) days of infraction. <br /> <br />· Third infraction - three (3) days banned from Caltrain right-of-way. <br /> <br />· Fourth infraction - banned from Caltrain right-of-way for one year. <br /> <br />Each infraction of not having evidence of training will be governed under the following: <br /> <br />· Instant removal from the Caltrain right-of-way. <br /> <br />IV. Policy Enforcement <br /> <br />Policy enforcement concerning infractions of this policy shall be referred to and handled by: <br /> <br />1. For Caltrain/SamTrans Engineering/Consultants/Contractors and Subcontractors: Referred by phone <br />or in writing within seventy-two (72) hours to SamTrans Safety Officer of Rail and Project Manager. <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.