My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 A-1 Fence, Inc. (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 A-1 Fence, Inc. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2010 4:25:38 PM
Creation date
8/18/2010 4:25:36 PM
Metadata
Fields
Template:
Agreement
Contractor Name
A-1 Fence, Inc.
PROJECT NAME
Fence installation at Observation Deck in Redwood Shores
RMP File Number
304.5
Date
8/18/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />3. Standard of Performance. All of the work to be done shall be done to the <br />approval of, City or its authorized representative, and the work shall be <br />done in the best workmanlike manner, conforming strictly to the provisions <br />of the specifications and plans made thereof. Work shall be done at times <br />that are agreed to by City. <br /> <br />4. labor Code provisions. Contractor shall comply with the provisions set <br />forth in that document entitled "labor Code Provisions" which is attached <br />hereto and incorporated herein by reference. <br /> <br />5. Liquidated Damages. It is hereby agreed by the parties to the Agreement <br />that in case all work called for under the Agreement is not finished or <br />completed on or before the time set forth in this Agreement, damage will <br />be sustained by City, and that it is and will be impracticable and extremely <br />difficult to ascertain and determine the actual damage which the City will <br />sustain in event of and by reason of such delay; it is therefore agreed <br />Contractor will pay to City the sum calculated at the rate of Five hundred <br />and 00/100 Dollars ($500.00) per day as liquidated damages for each and <br />every calendar day's delay in finishing the work in excess of the number of <br />days prescribed, and Contractor agrees to pay said liquidated damages as <br />herein provided, and in case the same are not paid, agrees that City may <br />deduct the amount thereof from any monies due or that may become due <br />under th is Ag reement. <br /> <br />It is further agreed that in case the work called for under this Agreement is <br />not completed in all of its parts and requirements within the number of <br />calendar days specified, City shall have the right to increase the number <br />of calendar days or not, as may seem best to serve the interest of City; <br />and if it is decided to increase the said number of calendar days, City shall <br />further have the right to charge to Contractor, and deduct from the final <br />payment for the work, all or any part, as City may deem proper, of the <br />actual cost of engineering, inspection, superintendence, and other <br />overhead expenses of City which are directly chargeable to this <br />Agreement, except that the cost of final surveys and the preparation of the <br />final estimate shall not be included in such charges to be paid by <br />Contractor. <br /> <br />6. Warranty for Work. Except as otherwise may be provided herein, <br />Contractor hereby expressly guarantees for one (1) full year from the date <br />of the final completion of the work under this Agreement and acceptance <br />thereof by City's City Council, to repair or replace any part of the work <br />performed hereunder which constitutes a defect resulting from the use of <br />inferior or defective materials, equipment or workmanship. If, within said <br />period, any repairs or replacements in connection with the work are, in the <br />opinion of the Manager, Engineering and Construction, rendered <br />necessary as a result of the use of inferior or defective materials, <br />equipment or workmanship, Contractor agrees, upon receipt of notice from <br />City, and without expense to City, to promptly repair or replace such <br />material or workmanship and/or correct any and all defects therein. If <br />
The URL can be used to link to this page
Your browser does not support the video tag.