My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Musson Theatrical, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Musson Theatrical, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2010 9:39:29 AM
Creation date
8/30/2010 9:37:03 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Musson Theatrical, Inc.
PROJECT NAME
Main Drape Replacement Veterans Memorial Senior Center
RMP File Number
304.5
Date
8/26/2010
Sticky Note
ID:
1
Text:
Performance Bond Pg 13.
Payment Bond Pg. 14.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br />(MUSSON THEATRICAL, INC.) <br /> <br />REEMENT is made and entered into as of the J t, day of <br />, 201() by and between the City of Re~ity, a <br />charter it an municipal corporation of the State of California ("City"), and <br />Musson Ttieatricallnc. of Santa Clara, CA ("Contractor") <br /> <br /> <br />RECITALS <br /> <br />A. City requires Contractor's services. <br /> <br />B. Contractor has the necessary experience in providing professional services <br />and advice. <br /> <br />C. Selection of Contractor is expected to achieve the desired results in an <br />expedited fashion. <br /> <br />D. Contractor has submitted a proposal to City and has affirmed its willingness <br />and ability to perform such work. <br /> <br />NOW, THEREFORE, in consideration of these recitals and the mutual <br />covenants contained herein, the Parties agree as follows: <br /> <br />1. Scope of Work and Time for Performance. Contractor shall perform <br />everything required to be performed, shall provide and furnish all of the <br />labor, equipment, materials, and tools to perform, within sixty (60) calendar <br />days after the "Notice To Proceed", the following work: <br /> <br />MAIN DRAPE REPLACEMENT <br />VETERANS MEMORIAL SENIOR CENTER <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto as described in Exhibit "A", attached hereto and <br />incorporated herein, signed by the Manager, Engineering and Construction <br />of Redwood City, which Documents are incorporated herein and made a <br />part of this Agreement as if herein fully set forth. <br /> <br />2. Compensation. City shall pay to Contractor, as full consideration for the <br />faithful performance by Contractor of the aforementioned work, the amount <br />of Twenty thousand four hundred and 00/100 Dollars ($20,400.00) <br />computed in accordance with Contractor's accepted Proposal dated July 23, <br />2010 which accepted Proposal is incorporated herein by reference thereto <br />as if herein fully set forth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.