My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Zeiger Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Zeiger Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2010 10:17:16 AM
Creation date
9/9/2010 10:17:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Zeiger Engineers, Inc.
PROJECT NAME
Redwood City Sanitary Sewer Pump Station #14 Improvements Project
RMP File Number
304.5
Date
9/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_ ... ~~ n .."':. .~___ :=""... ~__.,.;, _ <br /> <br />.... -"~~-::~.. .. --:':"....;- <br />__ - ..... . --, ,---..;;a..=,.:.....:. ~. - <br /> <br />....'.':~....~ _.- <br />... _.........,., -.- <br /> <br />-,.- .._!- .-=-:":~'''':' .- -... ,.: _~.~ =-_~_--il"" ,.- -~~~~',..:~ -~,.-x: _ ..-...=......;., ~ -- - ~ <br /> <br />Project Description: The project consists of providing construction documents for the <br />provision of replacing the existing Motor Control Center at the existing Sanitary Sewer <br />Pump Station # 14, replacing the existing submersible pumps and connecting a new fan on <br />site. The design shall include the field investigation of the existing facilities and interfacing <br />with the city's SCADA consultant for system function and incorporating into the design of <br />the new Motor Control Center. The existing generator with be reconnected to the new <br />Motor control Center. Allowance for two site observations/inspections duting construction <br />and two meetings with the city. The construction documents will be provided in two <br />phases; 70% and 100% design documents. <br /> <br />Our office win create the drawings in the latest version of ACAD in out' office but will <br />provide final documents to the city in 2007 ACAD. Any as-built, which the city has in <br />ACAD, format files or hand drafted plans will be provided to Zeiger Engineers to <br />incorporate into its design as required. <br /> <br />Basic Services: Electrical engineering work will include: <br /> <br />- site investigations of the existing conditions <br />.. Existing PG & E is adequate for the renovation/replacement and no work is <br />required for service upgrade. <br />- provide design for replacement of the existing MCC for the sanitary sewer station <br />and co-ordinate with City's SCADA consultant for controls. <br />electrical specifications and drawings <br />two site observations/inspections during construction <br />.. two coordination meetings with Redwood City representatives <br />- office consultation during construction (submittal review, RFIs, etc) <br />- Cost Estimate <br /> <br />Additional Services, work not included in our Basic Services, shall include, but is not <br />necessarily limited to: <br /> <br />1. Additional site observations/inspections during construction beyond the basic <br />contract. <br />2. Additional meetings beyond the two in the basic contract. <br />3. Code upgrades <br /> <br />Should you have any questions, or require any additional information on our proposal, <br />please do not hesitate to call me. The work can proceed as soon as a contract is issued. <br /> <br />Sincerely, <br /> <br />ZEIGER ENGINEERS, INC. <br /> <br />~JL <br />
The URL can be used to link to this page
Your browser does not support the video tag.