Laserfiche WebLink
<br />7.B <br />Page 31 <br /> <br />Equivalent is equal to one town home/condominium, or one hotel room, or 2,000 square feet of <br />retail space ("Residential Equivalent") for a total possible (if 436 EDU's are actually built) of 436 <br />Residential Equivalents if the entire Peninsula Park Precise Plan, including the hotel and <br />community-serving retail, is developed as described therein. The rate per each Residential <br />Equivalent shall be $1,784.40 ($778,000 divided by 436) r'Tank Fee"). The Developer shall pay <br />the required Tank Fee for each residential unit constructed pursuant to the Development <br />Agreement prior to issuance of each residential certificate of occupancy, and the hotel and/or <br />retail developer or developers, as applicable, shall pay the Hotel/retail Tank Fee, for up to 205 <br />residential equivalents, at time of building permit issuance for the Hotel and/or the community- <br />serving retail uses. City understands and agrees that so long as the Tank Fee is paid at the time <br />of each certificate of occupancy and building permit issuance, the Developer's obligation under <br />the Development Agreement with respect to the All Zones Water Storage Improvements shall <br />be fulfilled regardless of the size or number of rooms in the Hotel or the number of homes <br />constructed at completion of the Revised Project. <br /> <br />6. "All Zones Potable Water Line Under Highwav 101" Improvements <br /> <br />The Developer shall install, in accordance with the Plans, a 20" potable water line in an <br />existing sleeve under US Highway 101 in conformance with the Plans and concurrently with the <br />construction of the Bair Island Road Improvements. Upon doing so, the Developer shall have <br />completely and forever completed its obligation to pay its allocable share of this All Zones <br />Potable Water Line Under Highway 101 improvement. The Hotel developer shall be responsible <br />for the installation on the west side of Highway 101 of any potable water line connections <br />necessary to meet Hotel fire flow requirements. <br /> <br />7. "Blomquist Bridge" Improvements. <br /> <br />The City and Developer agree that: (1) the Blomquist Bridge project shall include the <br />Bridge Elements described in Section 4.0 above (collectively "Bridge Elements"), (2) a <br />comprehensive and integrated design is needed to avoid duplicative and wasteful construction <br />expense, and (3) City funds held in the Blomquist Bridge Fund (defined in Section 7.3) may be <br />used for the construction of the Blomquist Bridge and/or any Bridge Element. Developer and <br />City further agree that: (1) the City shall have responsibility for designing the Blomquist Bridge <br />Improvements, (2) the City will consult with the Developer in the course of the City's design <br />efforts, (3) the Developer shall pay its allocable share of the Blomquist Bridge Improvements at <br />the time of certificate of occupancy issued by the City for each residential home, and the hotel <br />and/or retail developer or developers shall pay the allocable shares for the hotel and retail <br />components described in the Peninsula Park Precise Plan upon the City's issuance of a building <br />permit for same, and (4) the City shall determine the timing of construction of the Blomquist <br />Bridge Improvements and shall contract for and oversee the construction of same. The Parties <br />further acknowledge that the Developer has previously dedicated to the City a Public Utility <br />Easement for relocation of the RSW Pump Station and that said dedication completely and <br />forever fulfills the Developer's obligation for the RSW Pump Station Bridge Element. <br /> <br />1500351.7 <br />9-08-2010 PCI <br /> <br />6 <br />