<br />East 101 Public Infrastructure Requirements
<br />
<br />, ,
<br />
<br />Attachment 2
<br />City of Redwood City
<br />
<br />
<br />Pro' ect Code
<br />R-BRIDGE Transportation (Bridge)
<br />R.UNDERPASS (ped underpass)
<br />R-NEWROAD (road from bridge to maple east)
<br />R-WBRIDGE . Water (Under the bridge :) )
<br />R-WBlOMQU/ST Water Pipe from Seaport to Bridge
<br />R-wrANK Water (Tank & PS & Land)
<br />R-W101 Waterline
<br />R-RWIDEND1 E. Bayshore Rd pavement
<br />R-RwtDEND2 Blom uist Rd, avement
<br />
<br />EDU
<br />
<br />
<br />Totals
<br />
<br />
<br /> EDU
<br /> Bayside Gardens
<br />A-W1 Water (zone dist system)
<br />S-SS1 Sewer (collection 5Y8)
<br />AB-SSPS Sewer (pump station) - Shared with B
<br />A-50PS Storm urn station
<br /> Zone Pro' ct Subtotal 604
<br /> All Zone Project Subtotal
<br /> Zone Project + All Zone Project Total
<br /> 88ysme Gardens Contribution 604
<br /> EDU
<br /> Pete's Harbor, Penn Park
<br />B-W1 Water (zone dist system)
<br />8-W2 Water (zone dist system)
<br />B-RW1 Recycled water
<br />B-5S1, 2 & 3 Sewer (collection sys)
<br />AB-SSPS Sewer um station - Shared with A
<br /> Zone Pro ct Subtotal 1401
<br /> All Zone Project SUbtotal
<br /> Zone Project + All Zone Project Total
<br /> Penn Par1c Contribution 1001
<br /> Pete's Harbor Contribution 400
<br />
<br />
<br />
<br />C-SS1
<br />
<br />
<br />EDU
<br />
<br />2635
<br />
<br />Cost
<br />$4,600,000.00
<br />$2,000,000.00
<br />$1,000,000,00
<br />$280,000.00
<br />$1,859,200.00
<br />$10,447.320,00
<br />$336,000.00
<br />$1,142,400.00 $
<br />$1,091,626.67
<br />$22 956,546.67
<br />
<br />
<br />Ci Contribution CosVEDU
<br />$5.000,000.00
<br />
<br />455,000.00
<br />
<br />Cost
<br />
<br />CosVEDU
<br />
<br />$571,200.00
<br />$357,000.00
<br />$295,273,17
<br />$980.000.00
<br />$2,203,473.17
<br />$5,263,153.02
<br />$7,466,626.19
<br />$7.466,626.19
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />$1,030,400.00
<br />$336,000,00
<br />$394,800.00
<br />$680,400.00
<br />$684,726.83
<br />$3,126326.83
<br />$12,205,044.07
<br />515,331,370.90
<br />$10,954,105,83
<br />$4.377.265,07
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />210
<br />
<br />$378.000.00
<br />$378 000.00
<br />$1,829,449.86
<br />$2,207,449.86
<br />!i2.2Q7,449.66
<br />
<br />
<br />210
<br />
<br />Zij;nJt't~"';.;y.;"r.. "it} ...: ::,:r~}~;r;:,:r.: EDU Cost CosUEDU
<br />Abbott Labs, Insdusttria/, Pacific Shores
<br />Water (area dist system) - TBD
<br />Sewer (collection sys) - TBD
<br />Road + Storm - TED
<br />Zone Proiect Subtotal 420 $0.00 '1"80:,ii"i:':'i':;::~, .
<br />All Zone Project Subtotal $3.658,899.72 1;:ltie~:i~~8t:~:
<br />Zone Project + All Zone Project Total $3,658,899,72
<br />
<br />Abbott Labs Site Contribution
<br />Industrial Area Contribution
<br />Pacific Shores Area Contribution
<br />
<br />270
<br />o
<br />150
<br />
<br />$2,352,149.82
<br />$0.00 Impact assessment will be case by c
<br />$1,306,749,90 basis via CEQA and Use Permit.
<br />
<br />This Table shows foreseeable projects for individual Zone and the Region. Additionel projects may be added,
<br />Each development is responsibl8 for construction of their own site utilities improvoment projects in addition to their monetary
<br />contribution end lor building of spec;nc zone and region projects.
<br />Project costs end EDU estimates are subject to annual review and revision
<br />EDU = 2000 SF Commercial Floor Area or one housing uir.