Laserfiche WebLink
<br />7.B <br />Page 161 <br />East 101 Public Infrastructure Requirements <br /> <br />, , <br /> <br />Attachment 2 <br />City of Redwood City <br /> <br /> <br />Pro' ect Code <br />R-BRIDGE Transportation (Bridge) <br />R.UNDERPASS (ped underpass) <br />R-NEWROAD (road from bridge to maple east) <br />R-WBRIDGE . Water (Under the bridge :) ) <br />R-WBlOMQU/ST Water Pipe from Seaport to Bridge <br />R-wrANK Water (Tank & PS & Land) <br />R-W101 Waterline <br />R-RWIDEND1 E. Bayshore Rd pavement <br />R-RwtDEND2 Blom uist Rd, avement <br /> <br />EDU <br /> <br /> <br />Totals <br /> <br /> <br /> EDU <br /> Bayside Gardens <br />A-W1 Water (zone dist system) <br />S-SS1 Sewer (collection 5Y8) <br />AB-SSPS Sewer (pump station) - Shared with B <br />A-50PS Storm urn station <br /> Zone Pro' ct Subtotal 604 <br /> All Zone Project Subtotal <br /> Zone Project + All Zone Project Total <br /> 88ysme Gardens Contribution 604 <br /> EDU <br /> Pete's Harbor, Penn Park <br />B-W1 Water (zone dist system) <br />8-W2 Water (zone dist system) <br />B-RW1 Recycled water <br />B-5S1, 2 & 3 Sewer (collection sys) <br />AB-SSPS Sewer um station - Shared with A <br /> Zone Pro ct Subtotal 1401 <br /> All Zone Project SUbtotal <br /> Zone Project + All Zone Project Total <br /> Penn Par1c Contribution 1001 <br /> Pete's Harbor Contribution 400 <br /> <br /> <br /> <br />C-SS1 <br /> <br /> <br />EDU <br /> <br />2635 <br /> <br />Cost <br />$4,600,000.00 <br />$2,000,000.00 <br />$1,000,000,00 <br />$280,000.00 <br />$1,859,200.00 <br />$10,447.320,00 <br />$336,000.00 <br />$1,142,400.00 $ <br />$1,091,626.67 <br />$22 956,546.67 <br /> <br /> <br />Ci Contribution CosVEDU <br />$5.000,000.00 <br /> <br />455,000.00 <br /> <br />Cost <br /> <br />CosVEDU <br /> <br />$571,200.00 <br />$357,000.00 <br />$295,273,17 <br />$980.000.00 <br />$2,203,473.17 <br />$5,263,153.02 <br />$7,466,626.19 <br />$7.466,626.19 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />$1,030,400.00 <br />$336,000,00 <br />$394,800.00 <br />$680,400.00 <br />$684,726.83 <br />$3,126326.83 <br />$12,205,044.07 <br />515,331,370.90 <br />$10,954,105,83 <br />$4.377.265,07 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />210 <br /> <br />$378.000.00 <br />$378 000.00 <br />$1,829,449.86 <br />$2,207,449.86 <br />!i2.2Q7,449.66 <br /> <br /> <br />210 <br /> <br />Zij;nJt't~"';.;y.;"r.. "it} ...: ::,:r~}~;r;:,:r.: EDU Cost CosUEDU <br />Abbott Labs, Insdusttria/, Pacific Shores <br />Water (area dist system) - TBD <br />Sewer (collection sys) - TBD <br />Road + Storm - TED <br />Zone Proiect Subtotal 420 $0.00 '1"80:,ii"i:':'i':;::~, . <br />All Zone Project Subtotal $3.658,899.72 1;:ltie~:i~~8t:~: <br />Zone Project + All Zone Project Total $3,658,899,72 <br /> <br />Abbott Labs Site Contribution <br />Industrial Area Contribution <br />Pacific Shores Area Contribution <br /> <br />270 <br />o <br />150 <br /> <br />$2,352,149.82 <br />$0.00 Impact assessment will be case by c <br />$1,306,749,90 basis via CEQA and Use Permit. <br /> <br />This Table shows foreseeable projects for individual Zone and the Region. Additionel projects may be added, <br />Each development is responsibl8 for construction of their own site utilities improvoment projects in addition to their monetary <br />contribution end lor building of spec;nc zone and region projects. <br />Project costs end EDU estimates are subject to annual review and revision <br />EDU = 2000 SF Commercial Floor Area or one housing uir. <br /> <br />~ 12/1112007 <br />