Laserfiche WebLink
<br />r- ----- <br /> <br />done in the best workmanlike manner, conforming strictly to the provisions <br />of the specifications and plans made thereof. Work shall be done at times <br />that are agreed to by City. <br /> <br />4. Labor Code provisions. Contractor shall comply with the provisions set <br />forth in that document entitled "Labor Code Provisions" which is attached <br />hereto and incorporated herein by reference. <br /> <br />5. Liquidated Damages. It is hereby agreed by the parties to the Agreement <br />that in case all work called for under the Agreement is not finished or <br />completed on or before the time set forth in this Agreement, damage will <br />be sustained by City, and that it is and will be impracticable and extremely <br />difficult to ascertain and determine the actual damage which the City will <br />sustain in event of and by reason of such delay; it is therefore agreed <br />Contractor will pay to City the sum calculated at the rate of Five hundred <br />and 00/100 Dollars ($500.00) per day as liquidated damages for each and <br />every calendar day's delay in finishing the work in excess of the number of <br />days prescribed, and Contractor agrees to pay said liquidated damages as <br />herein provided, and in case the same are not paid, agrees that City may <br />deduct the amount thereof from any monies due or that may become due <br />under this Agreement. <br /> <br />It is further agreed that in case the work called for under this Agreement is <br />not completed in all of its parts and requirements within the number of <br />calendar days specified, City shall have the right to increase the number <br />of calendar days or not, as may seem best to serve the interest of City; <br />and if it is decided to increase the said number of calendar days, City shall <br />further have the right to charge to Contractor, and deduct from the final <br />payment for the work, all or any part, as City may deem proper, of the <br />actual cost of engineering, inspection, superintendence, and other <br />overhead expenses of City which are directly chargeable to this <br />Agreement, except that the cost of final surveys and the preparation of the <br />final estimate shall not be included in such charges to be paid by <br />Contractor. <br /> <br />6. Warranty for Work. Except as otherwise may be provided herein, <br />Contractor hereby expressly guarantees for one (1) full year from the date <br />of the final completion of the work under this Agreement and acceptance <br />thereof by City's City Council, to repair or replace any part of the work <br />performed hereunder which constitutes a defect resulting from the use of <br />inferior or defective materials, equipment or workmanship. If, within said <br />period, any repairs or replacements in connection with the work are, in the <br />opinion of the Manager, Engineering and Construction, rendered <br />necessary as a result of the use of inferior or defective materials, <br />equipment or workmanship, Contractor agrees, upon receipt of notice from <br />City, and without expense to City, to promptly repair or replace such <br />material or workmanship and/or correct any and all defects therein. If <br />Contractor, after such notice, fails to proceed promptly to comply with the <br />terms of this guarantee, City may perform the work necessary to <br />