|
6.1 D
<br /> Page 14
<br /> ESTIMATED COS75�OR
<br /> REDWOOD CITY BRIDGES REPAIR
<br /> , w �
<br /> T�w rorni.
<br /> 1RCo ��^� DJPA E8TtMAT�
<br /> TASK cas7s Au
<br /> a Pw re cwd ��.r
<br /> ASK 1•Project Management and Coordfnatlon
<br /> �.1��p� 2,�40 1,280 3.32t} 3,320
<br /> 1.2 Kidc-olf and Design Team Me�lings 1,020 610 1,660 1,660
<br /> 1,3 Pr ectSchedule 255 640 895 B95
<br /> 3ubtotal Taek 1 3,315 2,5b0 5,875 5,875
<br /> ASK 2 Grant Researcfi and Applicttion Prepuedlon
<br /> 2.1 Research grarrt oppawrr�es for bridge repairs 345 34S 345
<br /> 2.2 Prepare ant a tions 920 920 920
<br /> Subtotal Tpsk 2 1,265 1,265 1,265
<br /> ASK 3•Prepare Cltywtde Bridge Report
<br /> 3.1 Repare Citywide Bridge Report
<br /> 3.1.1 Data Collec�on 320 160 500 500
<br /> 3.1.2 CoorcMate Pe�mitting 255 320 575 575
<br /> 3,1.3 Perfam Field Re�iews 3,840 2,160 6,060 6,000
<br /> 3.1.4 Perfam&idge Pkwy Bddge cdumn test�Cj 510 320 830 5,000 5,830
<br /> 3.2 Repare&idge RepoR 6,400 720 5U0 7,680 1,680
<br /> 3.3 Meet with Caltra�OL�IFISLA and Maintenance Division 1,a20 640 1,660 1,660
<br /> Subtotal Task 3 1,785 11,840 3,060 560 17,�45 SA00 22,245
<br /> ASK�-Prelimin�ry Enginooring(359�Dssign)
<br /> dge Parlcw,y Bridge Structure onlyl
<br /> 4.1 P &id a R u Slrat 6,400 1,800 560 8.760 8,160
<br /> �btotal T�tk 4 6,400 1,800 560 8,T60 8,760
<br /> ASK S-Final P38E De�ign (Bridge
<br /> arkway Br{dga 3hucture only)
<br /> 5,1 Prepare 6596 Unchecked Plans 1,020 3,840 5,400 5,fi00 15,860 15,860
<br /> 5.2 Prepere 9596 Checked Plans 1,020 2,560 3,600 1,120 8,300 8,300
<br /> 5,3 PrepatB Final PS&E 640 1,440 560 2,640 2,640
<br /> 8ubtotal TBSk 5 2,040 7,040 1U,440 7,280 26,800 26,�00
<br /> Ab'K 8-Bid Phase SuPport (Brid9e
<br /> rkw�y Bridga Structure only)
<br /> 6.1 Prebid me�ng and response to bidder irquiries 510 320 B30 830
<br /> Subtata!Task 6 510 320 � �
<br /> OTAL FOR PROJECT 7,650 28,160 15,300 S,q00 1,265 60 775 5 OQO 65,77
<br /> Note:Preiminary aod Canstruction Eng'a�ee�ing costs are cons�ered reimburseable work for projects eAgible fa the HBP program
<br /> A8K 8•( ONAL)•Praparation of Biologlcal and Environmental
<br /> fes (Bridge Pukwey Brldge
<br /> cture only)
<br /> &1 Meetings and Coa�ination 5,000 5.000
<br /> 8.2 NEPATechnicai Study and Cat E�c �-� ���
<br /> &3 CEQA Ir�ial StudylA�lUgated Negative Declazation 25,000 25,000
<br /> 8.4 ula A Perm�s 25,OD0 25,000
<br /> Subt�tal Task 8 7 000 T5 000
<br /> ASK 9•(OPTIONAL)-Undenrate�tnspec�ion of four columns
<br /> ddge Parkway Bridge Structure only}
<br /> 9.1 Undeiwat�r Ins ' of faa wate�wa columns B.000 8,000
<br /> 5ubtotal Tesk 6 8,000 8 000
<br />
|