My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2010-115130 (2)
RedwoodCity
>
City Clerk
>
Recorded Docs 2010-2012
>
2010
>
RecDoc 2010-115130 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2010 2:11:45 PM
Creation date
10/6/2010 4:30:02 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Amendment
Subject
1st Amendment to Development Agreement R.C. Pen
Doc Num
2010-115130
Rec Date
10/1/2010
Address
One Marina Community Facilities District No. 2010-1
Parties
R.C. Peninsula Prk, LLC
Reso Ref
14830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Bair Island Road Improvements; Reimbursement Methodology for Excess Costs. <br />Developer will be responsible for the initial funding, and /or construction, and installation, as <br />to be determined by the City, of the Improvements listed in this Section 2 (the "Bair Island <br />Road Improvements ") as described on the "Bair Island Road Improvement Plans" prepared by <br />KPFF Consulting Engineers, dated September 29, 2009, and approved by the City on October 19, <br />2009 (the "Roadway Plans ") and as described on the Bair Island Road Landscape Improvements <br />Plans prepared by Guzzardo Partnership, Inc., dated March 15, 2010 and approved by City on <br />March 29, 2010 (the "Landscape Plans ") as said Roadway Plans and Landscape Plans may be <br />revised, supplemented or altered by mutual written agreement of the City and Developer. The <br />Roadway Plans and the Landscape Plans are collectively referred to herein as the "Plans ". The <br />Plans are on file with the City. As of the date of this Amended Plan, the Developer's all inclusive <br />estimate of the cost of the Bair Island Road Improvements to be installed in the area from <br />Station 0 +00 to Station 23 +80 as designated on the Plans is $4,011,902 ( " Estimated Cost "). <br />Developer's responsibility for the Bair Island Road Improvements is subject to all of the <br />following: <br />(a) Developer shall not be responsible for funding or construction of potable water, re- <br />use water, sanitary sewer, joint trench, roadway, landscape, utility or any other utility or <br />improvement of any kind shown on the Plans beyond Developer's north property line shown as <br />approximately Station 23 +80 on the Plans. <br />(b) Developer (or a CFD, if applicable) shall be entitled to receive reimbursement for <br />Excess Costs (defined below) from fees that City shall collect from the Benefitted Properties <br />(defined below), provided that such reimbursement from the Benefitted Properties shall not <br />exceed sixty -two and 10/100 percent (62.1 %) of the actual cost to construct the Bair Island <br />Road Improvements (the "Excess Costs "), subject to a maximum reimbursement in the amount <br />of $2,491,391 ( " Excess Cost Cap "). The "Benefitted Properties" are properties that have direct <br />access to Bair Island Road and the Bair Island Road Improvements and are the properties <br />known as " Pete's Harbor" (San Mateo County Assessor's Parcel No. 052 - 540 -010, 052 - 540 -040, <br />and 052 -540 -050) and the "Bair Island Infill Property" (comprised of the "Mini Storage" (San <br />Mateo County Assessor's Parcel No. 052 - 520 -360) and the "Bayport Marina Plaza" (San Mateo <br />County Assessor's Parcel Nos. 052 - 520 -260, -270, and - 280)). At the time building permits are <br />issued for construction on the Benefitted Properties, City agrees to collect fees in the amount <br />of $3,489 per Residential Equivalent (as defined in Section 5 below) from the owners of the <br />Benefitted Properties and agrees to remit the same as reimbursement to the Developer (or to a <br />CFD, if applicable), subject to the limitations on such reimbursements set forth herein. The cost <br />allocation formula set forth in this paragraph is based upon the following Residential Equivalent <br />assumptions: <br />One Marina: <br />436 <br />37.9% <br />Pete's Harbor: <br />412 <br />35.8% <br />Bair Island Infill: <br />302 <br />26.3% <br />S:ATTY /AG R/2010.111/EXH I BIT3 <br />9/28/10 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.