My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-10-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-10-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2015 1:07:15 PM
Creation date
10/7/2010 3:42:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
10/11/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3B <br /> applicants can refer to as models and have refined and adapted for their own buil& s.3 <br /> Once an application for an SIP grant is approved, the recipient also would be eligible to <br /> have certain design costs reimbursed, up to a maximum amount of $7,000. The <br /> design would have to be approved by the Agency and generally be consistent with the <br /> conceptual prototypes. A list of pre-approved design consultants would be developed <br /> that may include architects, graphic designers, interior designers, and window <br /> designers depending upon the improvements required. If an applicant selects a design <br /> consultant not on the pre-approved list, the selection must be approved by staff to <br /> receive Agency assistance. The DAS grants would only be provided to successful SIP <br /> grant applicants and the terms for reimbursement would be included in the GMA. <br /> For easy reference, Attachment 3 compares the current programs to the proposed <br /> modified programs. It also includes a sample grant/cost sharing analysis (Attachment <br /> 3a). <br /> ALTERNATIVES <br /> 1. Leave the programs as they are. <br /> 2. Propose different or other modifications. For example, the Eligibility Area could <br /> be expanded to include all commercial buildings on El Camino Real (ECR) from <br /> Whipple to Charter; Broadway from Maple to Woodside; Main from Maple to <br /> ECR; and Middlefield from Woodside to Charter. <br /> FISCAL IMPACT <br /> The adopted FY 2010111 Agency budget allocates $102,000 to the SIP (#807-66464). <br /> $300,000 was also allocated (#807-71796) for the Economic Development Stimulus <br /> Programs in the Agency Budget Appropriations Revisions approved for FY 2009/10 in <br /> April, 2010, for a total amount of $402,000 that is available for both the SIP and DAS <br /> programs. <br /> hr .At c.11//1 <br /> Susan Moeller Patricia J.Webb <br /> Senior Redevelopment Advisor Economic Development Coordinator <br /> Jill Ekas,AICP Peter C. In am, Executive Director <br /> Planning, Housing &Economic Redevelopment Agency <br /> Development Director <br /> ATTACHMENTS <br /> 1. Resolution <br /> Exhibit A-Summary Modified Storefront Improvement Program (SIP) and <br /> Design Assistance Services (DAS) Terms <br /> Exhibit B-Agreement for Storefront Improvement Program Grant and <br /> Maintenance Agreement <br /> Attachment A-Scope of Work and Budget <br /> Attachment B-Contractor Requirements <br /> Attachment C-Maintenance Standards <br /> 82483.00000\4753953.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.