My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Green Environment Inc (2).
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Under 60K
>
Agmt10 Green Environment Inc (2).
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2011 4:38:48 PM
Creation date
10/11/2010 2:23:22 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Environment Inc. (GEI)
PROJECT NAME
Exterior environmental subsurface investigation 2065 Broadway, 2075 Broadway, 1017 Middlefield Rd., Redwood City
RMP File Number
304.5
Date
9/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT <br /> 1659C Industrial Road <br /> Green San Carlos. CA 94070 <br /> Environment Inc T 650.508.8018 <br /> wwwgreenenvironment.com F 650.508.8005 <br /> GREEN ENVIRONMENT INC. CONTRACT PROPOSAL <br /> GEI PROJECT #: B07378 -2010A (rev) <br /> „ , .,. <br /> Names: BaeGem Properties, L.P., BaeGem Properties L.P., 115 2065 Broadway, 2075 Broadway, <br /> City of Redwood City Dean Road, Woodside, CA 94062 1017 Middlefield Road, Redwood <br /> City, CA <br /> Contacts: Vera Goldsmith, BaeGem City of Redwood City, 1017 <br /> Phone: Brian Lee, City of Redwood City Middlefield Road, Redwood City, <br /> CA 94603 <br /> r R }' ( ' "`;� L .• Proposal Date: 9/712010 <br /> Exterior environmental subsurface investigation. Prepared By: M. Green <br /> Payment Terms: Net 30 <br /> � }w: :: , ., , T r ,;' ,Y -,�•, `� • j t.: qq Y3 f..., i.,+" �w§+ „' q� w. � € A ..., .�:.. yf ,� S” ,„. '.� 4€ I i 3 yf "✓ a { -'.... .... .:�' �.. ^�_ � � a s' <br /> Project Tasks (see attached Figure 1) <br /> • Perform utility clearance of outdoor soil boring and groundwater monitoring well locations. Billed on a <br /> • Procure drilling permits from SMCoGPP and City, and access agreements from property owners. T &M basis <br /> • Plan and schedule work with contractors, SMCoGPP, City and Tenants /Owners. according to <br /> + Complete Boring B -14 in City right -of -way adjacent to Broadway in backfill of operating box attached 2010 <br /> culvert. GEI Schedule <br /> • Complete Boring B -15 in asphalt paved yard at rear of 2065 Broadway, north of abandoned box Of Charges. <br /> culvert in native soils. <br /> • Complete Boring B -16 in City parking lot at former Borings B -4A/ B -4B in native soils. <br /> • Construct new groundwater monitoring well (MW -1 R) adjacent to Well MW -1 in City parking lot. <br /> • Construct new groundwater monitoring well (MW -2) at former Borings B -1AB -1 B in BaeGem <br /> parking lot; <br /> • Construct new groundwater monitoring well (MW -3) in BaeGem parking lot to be arranged in <br /> triangulation with Wells MW-1R and MW -2; <br /> + Collect up to four (4) soil samples per each of the three (3) borings and three (3) wells. <br /> • Collect up to four (4) grab groundwater samples total from the three (3) borings. <br /> • Survey (x,y,z) wells. <br /> • Develop wells and collect initial groundwater samples from the wells. <br /> • Analyze all soil samples for purgeable petroleum hydrocarbons, extractable petroleum <br /> hydrocarbons with a silica gel cleanup, volatile organic compounds and percent moisture. <br /> • Analyze all groundwater samples for purgeable petroleum hydrocarbons, extractable petroleum <br /> hydrocarbons with a silica gel cleanup, volatile organic compounds, chloride and TDS. <br /> • Analyze two (2) water trip blanks for purgeable petroleum hydrocarbons and volatile organic <br /> compounds. <br /> • Arrange for proper disposal of all wastes generated (soil cuttings, groundwater, decon water) in <br /> the performance of the work which will include analyzing a composite soil sample for CAM 17 <br /> Metals and Semi - volatile Organic Compounds. <br /> • Prepare a report with the outdoor site investigation results and recommendations, including <br /> strategy and costs for conducting interior environmental subsurface investigation of 2075 <br /> Broadway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.