Laserfiche WebLink
GEI E+ S riment inc. t. <br /> 2010 GEI SCHEDULE OF CHARGES <br /> Staff: <br /> Certified industrial Hygienist $210.00 /hr <br /> Principal Engineer/ Geologist $200.00 /hr <br /> Senior Engineer /Geologist $175.00/hr <br /> Senior Staff /Project Manager $165.00/hr <br /> Staff Engineer /Geologist $125.00/hr <br /> Senior Technician /CAD $105.00/hr <br /> Technician $ 95.00 /hr <br /> Clerical $ 75.00 /hr <br /> Travel 60% of staff bill rate, plus $0.55 /mile <br /> Field Equipment/Supplies: <br /> Brass soil sample tubes /sleeves $4.50 /tube <br /> Decon equipment/supplies $20.00 /day <br /> Digital camera $12.00 /day <br /> Disposable Bailer $10.00 /ea <br /> Draeger Detector Tube Pump $25.00 /day <br /> Draeger sensing tubes cost plus 15% <br /> Hand soil auger w /extensions $30.00 /day <br /> Hand slide soil sampler w /extensions $30.00 /day <br /> Low Flow Groundwater Sampling Equipment $180 /day <br /> Mini -RAM Dust Monitor w /data logger $90.00 /day <br /> MiniRAE 2000 PID $75.00 /day <br /> pDR 1200 active particulate sampler $105.00 /day <br /> pH /temp /conductivity meter $30.00 /day <br /> Personal field safety clothing /equipment $30.00 /day <br /> Personal Sampling Pump — Low Flow $30.00 /day <br /> GEI Van or Truck $30.00 /day <br /> PVC Casing (screened) $35/5 ft <br /> PVC Casing (solid) $25/5 ft <br /> Water level meter $30.00 /day <br /> 55 gallon drum $75.00 /ea <br /> Weekly rental rates can be quoted upon request, per project. <br /> Office Equipment/supplies: <br /> Copies (plain) $0.10 /page <br /> Copies (color) $2.50 /page <br /> Postage /shipping $ cost + 20% <br /> External Services /Equipment/Materials <br /> cost + 20% <br />