Laserfiche WebLink
�° EXHIBIT � i, <br /> I � <br /> �, <br /> � <br /> ,;; ; i <br /> � 1659C Industrial Road � <br /> ��I Green San Carlos, CA 94070 i <br /> Environmenf inc T 650.508.8018 <br /> wwwgreenrmtronmencmm F 650.508.8005 : <br /> GREEN ENVIRONMENT INC. CONTRACT PROPOSAL <br /> GEI PROJECT #: B07378-2071C-1C <br /> Names: City of Redwood Clty City of Redwood City, 1017 2075 Broadway, Redwood City, CA <br /> Middlefleld, Redwood City <br /> City Parking Lot, 1017 Middlefield, <br /> Redwood City, CA <br /> Contacts: Brian Lee, Engineer <br /> 2065 Broadway, Redwood Ciry, CA <br /> Proposal Date: 5120/it <br /> One (1) monitoring event of three (3) existing groundwater monitoring wells (MW-1 R, Prepared By: M. oreen � <br /> MW-2, MW-3) In August, 2011. Drllling and sampling of Boring B-15 at 2065 <br /> Broadwa . Paymenirerms: Neeao <br /> Prolect Tasks � <br /> Well Monitoring <br /> • Check condition of wells, measure watar levels and collect groundwater samples from each well <br /> using low-flow sampling protocol and equipment. <br /> • Submit three (3) groundwater samples to California-certified enalytical laboratory for analyses for <br /> purgeable petroleum hydrocarbons, extrectable petroleum hydrocarbons with a silica gel cleanup, <br /> and volatile organic compounds on a normal lab turn. <br /> � Analyze one (7 ) water trip blank for volatile organic compounds. <br /> • Arrange for propas disposai ot well purge water. <br /> + Prepare a reporl documenttng the work completed, analytical findings, and recommendations. <br /> • Upload report to Geotracker and provide electronic copy to clients. <br /> Borina B-15 <br /> • Perform utility clearance of soil boring. <br /> • Plan and schedule work with contractors, SMCoGPP and property owner. <br /> • Complete one (1) vertical boring outside rear of building. <br /> • Cotlect up to three (3) soil samples from boring. <br /> � Collect one grab flrst-encountered groundwater sample from boring. <br /> • Analyze all soil samples (maximum of 3) for purgeable petroleum hydrocarbons, extractable <br /> petroleum hydrocarbons with a silica gel cl.eanup, volatile organic compounds and percenf <br /> moisture. <br /> • Analyze groundwater sample (maximum of 1) for purgeable petroieum hydrocarbons, exirectabte <br /> petroleum hydrocarbons with a silica gel cleanup and volatile organic compounds. <br /> • Analyze one (1) water trip blank for volatile organic compounds. <br /> • Arrange for proper d(sposal of all wastes generated (soil cuttings, decon water) In the <br /> pefformance of the work. <br /> • Prepare a repoA documeniing the work completed, analyfical findings, end recommendations. <br /> • Upload report to Geotrecker and provide electronic copy to clients. <br />