My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Schrader Leask Development, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Schrader Leask Development, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2010 3:31:38 PM
Creation date
10/13/2010 3:29:33 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Schrader Leask Development, Inc.
PROJECT NAME
Real Estate Option Agreement 80 Chemical Way APN 052-392-190
RMP File Number
304
Date
10/1/2010
MO Ref
10-194
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
action, claims, liabilities, damages, losses, fees, fines, costs and expenses including attorneys' <br /> and experts' fees (collectively, "Claims "), for any injury, loss, or damage to persons or property <br /> occurring in connection with the inspections and studies conducted by Optionee's Authorized <br /> Parties, except that Optionee shall have no liability for and no obligation to remedy any <br /> conditions or defects on or under the Real Property (i) not caused by a Optionee Authorized <br /> Party including those that are discovered by a Optionee Authorized Party during its <br /> investigations and inspections, or (ii) resulting from the acts or omissions of Owner, or any past <br /> and/or present occupant of the Real Property or their respective agents, engineers, contractors, <br /> consultants and representatives. Optionee's obligations to indemnify and hold Owner and <br /> Owner's Parties harmless pursuant to this Paragraph (9a) shall survive the termination of this <br /> Agreement and the Closing. <br /> (b) Cooperation. Owner shall provide Optionee and its consultants with the <br /> opportunity to consult with Owner's environmental consultants and to review any work product <br /> prepared by or in the possession of such consultants provided Owner is not legally or <br /> contractually precluded from doing so. Owner shall cooperate (at no out -of- pocket cost to <br /> Owner) in all reasonable respects in connection with Optionee's evaluation of the environmental <br /> condition of the Property and any required clean -up or remediation of Hazardous Materials on, at <br /> or under the Property, including executing any authorizations or other documents required for <br /> Optionee to obtain access to documents or other information relating to the condition of the <br /> Property. <br /> 10. Conditions of Optionee's Performance. Optionee's obligation to close escrow <br /> under this Agreement is subject to Optionee's written approval of the following conditions at or <br /> before the earlier of the Closing or such earlier time expressly provided below in this <br /> Paragraph 10, but Optionee shall have the right to waive any such condition in writing within <br /> the time period specified in such condition. If any of the following conditions is not satisfied or <br /> waived in writing by Optionee, then Optionee shall be entitled to terminate this Agreement, in <br /> which event all Deposits shall be returned immediately to Optionee with interest earned thereon, <br /> without any further obligation on the part of either Optionee or Owner, subject to any remedies <br /> Optionee may have to the extent that a failure of condition also constitutes a default by Owner <br /> under this Agreement. <br /> (a) Feasibility Study. Optionee may, in Optionee's sole discretion, approve or <br /> disapprove the condition of the Real Property and the feasibility of using the Real Property for <br /> Optionee's intended purposes (the "Feasibility Study ") at any time during the period (the <br /> "Feasibility Period ") commencing on the Opening of Escrow and ending at 5:00 p.m. on the <br /> date that is ninety (90) days after the Opening of Escrow. During the Feasibility Period, <br /> Optionee shall have the right to deliver to Owner written notice (the "Notice to Proceed ") of <br /> Optionee's approval of the Feasibility Study and election to proceed with the purchase of the <br /> Property. Optionee shall be deemed to have disapproved the Feasibility Study if Optionee does <br /> not deliver the Notice to Proceed to Owner during the Feasibility Period. If Optionee <br /> disapproves of or is deemed to have disapproved of the Feasibility Study, then the Deposits <br /> previously made by Optionee shall be immediately returned to Optionee. <br /> (b) Documents. To the extent Owner has not previously done so, within <br /> three (3) days after the Execution Date, Owner shall provide Optionee with copies of all <br /> Option Agreement 80 Chemical <br /> 10.01. 2010 v.7 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.