My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2010-115130
RedwoodCity
>
City Clerk
>
Recorded Docs 2010-2012
>
2010
>
RecDoc 2010-115130
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2010 2:00:33 PM
Creation date
10/20/2010 2:00:30 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Amendment
Subject
First Amendment to Development Agreement 1 Marina
Doc Num
2010-115130
Rec Date
10/1/2010
Address
One Marina
Parties
Redwood City and R.C. Peninsula Park, LLC
Reso Ref
14830
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ratably on a per Residential Equivalent basis at the time of issuance of each certificate of <br /> occupancy for each Residential Equivalent constructed as a part of the Revised Project where a <br /> Residential Equivalent is equal to one townhome /condominium, or one hotel room, or 2,000 <br /> square feet of retail space ( "Residential Equivalent ") for a total possible (if 436 EDU's are <br /> actually built) of 436 Residential Equivalents if the entire Revised Project and the hotel and <br /> community- serving retail described in the Precise Plan are developed. The rate per each <br /> Residential Equivalent shall be $1,784.40 ($778,000 divided by 436) ( "Tank Fee "). The <br /> Developer shall pay the required Tank Fee for each residential unit constructed pursuant to the <br /> Development Agreement prior to issuance of each residential certificate of occupancy, and the <br /> hotel and /or retail developer or developers, as applicable, shall pay the Hotel /retail Tank Fee, <br /> for up to 205 Residential Equivalents, at time of building permit issuance for the Hotel and /or <br /> the community- serving retail uses. City understands and agrees that so long as the Tank Fee is <br /> paid at the time of each certificate of occupancy and building permit issuance, as applicable, <br /> P anc P <br /> Y g P Pp , <br /> the obligation of the Developer and the developer(s) of the Hotel and community- serving retail <br /> space described in the Precise Plan with respect to the All Zones Water Storage Improvements <br /> shall be fulfilled regardless of the size or number of rooms in the Hotel or the number of homes <br /> constructed at completion of the Revised Project. <br /> 6. "All Zones Potable Water Line Under Highway 101" Improvements <br /> The Developer shall install, in accordance with the Plans, a 20" potable water line in an <br /> existing sleeve under US Highway 101 in conformance with the Plans and concurrently with the <br /> construction of the Bair Island Road Improvements. Upon doing so, the Developer shall have <br /> completely and forever completed its obligation to pay its allocable share of this All Zones <br /> Potable Water Line Under Highway 101 improvement. The Hotel developer shall be responsible <br /> for the installation on the west side of Highway 101 of any potable water line connections <br /> necessary to meet Hotel fire flow requirements. <br /> 7. "Blomquist Bridge" Improvements. <br /> The City and Developer agree that: (1) the Blomquist Bridge project shall include the <br /> Bridge Elements described in Section 4.0 above (collectively "Bridge Elements "), (2) a <br /> comprehensive and integrated design is needed to avoid duplicative and wasteful construction <br /> expense, and (3) City funds held in the Blomquist Bridge Fund (defined in Section 7.3) may be <br /> used for the construction of the Blomquist Bridge and /or any Bridge Element. Developer and <br /> City further agree that: (1) the City shall have responsibility for designing the Blomquist Bridge <br /> Improvements, (2) the City will consult with the Developer in the course of the City's design <br /> efforts, (3) the Developer shall pay its allocable share of the Blomquist Bridge Improvements at <br /> the time of certificate of occupancy issued by the City for each residential home, and the hotel <br /> and /or retail developer or developers shall pay the allocable shares for the hotel and retail <br /> components described in the Precise Plan upon the City's issuance of a building permit for <br /> same, and (4) the City shall determine the timing of construction of the Blomquist Bridge <br /> Improvements and shall contract for and oversee the construction of same. The Parties further <br /> acknowledge that the Developer has previously dedicated to the City a Public Utility Easement <br /> S:ATTY /AG R/2010.111/EXH I BIT3 <br /> 9/28/10 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.