Laserfiche WebLink
3 -11 -03 <br />Engineering Department <br />City of Redwood City - City Hall <br />1017 Middlefield Road P.O. Box 391 <br />Redwood City, CA 94063 <br />Attn: Mr. Brian Lee <br />WINGES <br />ARCHITECTS f <br />EXHIBIT ..A.. <br />_ ^a <br />VIA FAX: (650) 780 -7309 <br />Ref Public Works Service Warehouse Offices — additional service fees for scope change <br />Dear Brian; <br />Per your request, we have received proposals from our consultants for the changes and have <br />estimated as follows our additional efforts to change the design per the new requirements and scope. <br />Please note that we were already 95% complete with the drawings and specs on the original scheme, <br />and have billed that under separate cover. <br />Our estimated additional fees to be addetl to the existing contract sum to re-do the CD portion of the <br />package are as follows: <br />Architectural revisions and coordination: Project Manger: Cecil Lectura: <br />30 hours at $85/hour = $2,550 <br />WR. Brown — Re -do complete mechanical design: $6150.00 x 1.1 = $6,765 <br />(see attached proposal) <br />SCE Engineers — Electrical additions and revisions: $2,800 x 1.1 = $3,080 <br />(see attached letter) <br />Total additional to be added: <br />$12,395.00 <br />All other services and work will continue and remain the same. Therefore, the contract sum should <br />be changed as follows: <br />Original Contract: $64,000 <br />Scope Changes above: $12,395 <br />NEW CONTACT SUM: $76,395.00 <br />Page 1 of 5 <br />R7.4'GES ARCH=M INC VW HO ARD AIT. SUTE 311. BURLMaG CA 04010 FAY /6501 313-1 ?➢1 / 11d® TEL. (650) 343 -1101 <br />ARCHTTFMRE MASTER PIM ING WERIOR ARCW EC= / .To EPUNNBVG I DESIGNCOL,MEUNG <br />