My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CC Min 2003-03-27 Spc
RedwoodCity
>
City Clerk
>
Minutes
>
2000-2009
>
2003
>
CC Min 2003-03-27 Spc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2011 2:58:46 PM
Creation date
4/24/2003 1:15:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Joint
Date
3/27/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. PLEDGE OF ALLEGIANCE — Barbara Pierce, Council Member <br />4. ORAL COMMUNICATIONS <br />Concetto Raiti stated his complaint regards the work on Roosevelt, prior to the work <br />he had two parking places (three after removing the fireplug) and now there are none. <br />He stated that between his house, next door and across the street, they have lost <br />seven parking spaces. <br />Council Member Ruskin stated that he had spoken with Ms. Humphrey and told her he <br />would be speaking with City Manager Everett. He further stated that Mr. Everett now <br />has a detailed understanding of the concerns and will be calling Ms. Humphrey and <br />Mr. Raiti about the issue. <br />5. STUDY SESSION: <br />Joint Study Session to Review Concept Plans for Retail /Cinema Project <br />( Continued from March 3, 2003) <br />Redevelopment Manager Moeller gave the background stating that this is the second <br />in a series of joint study sessions to review concept plans for the Retail /Cinema <br />Project. On March 3, a presentation was made by the architect for the building <br />elevations and site plan. This presentation pertained to the streetscape plan for the <br />project with staff returning in approximately 30 -40 days with revisions to the plans of <br />the theatre and building based on input and comments received from the last meeting <br />and this meeting. The architect and developer are in the process of preparing cost <br />estimates on the proposed designs and revisions that might be incorporated based on <br />the input received. This will provide a better grasp and handle on the costs of the <br />construction and know that the proposal is within the budget established for the <br />project. <br />Michael Freedman, of Freedman, Tung and Bottomley, presented the various concept <br />plans for the streetscape for the Retail /Cinema project. Freedman and Community <br />Development Services Manager Patterson summarized the circulation context as part <br />of the overall deliberation and consideration of the streetscape: <br />Comments from the Council, Planning Commission and Architectural Committee <br />Members included interest in Alternate 213, cobbles with flat areas and flush tree <br />grates, softer trees, possibly stanchions with planters, and no interest in palm trees. <br />SPECIAL CITY COUNCIL MEETING & JOINT STUDY SESSION WITH MARCH 27, 2003 <br />PLANNING COMMISSION & ARCHITECTURAL REVIEW COMMITTEE PAGE 3 <br />MINUTES <br />MINUTES Book No. 59 <br />Page No. 427 <br />
The URL can be used to link to this page
Your browser does not support the video tag.