My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:31:06 PM
Creation date
4/24/2003 4:02:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
4/28/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I4 <br />Scope of Services, Page - EXHEEIrr A - <br />b. Paving color /material 2 <br />C. Masonry furnishing color /material I <br />d. Masonry famishing color /material 2 <br />e. Metalwork paint color/finish <br />T. Concept modifications for budget conformance <br />1. Develop cost savings strategy memo (if needed) — if preliminary direction from City Staff <br />is to determine cost savings strategy, prepare a memorandum of recommendations that <br />prioritize actions and areas of cost savings in order to preserve the greatest degree of the <br />design intent expressed by workshop and staff comments. <br />U. Joint Planning Commission & City Council Study Session <br />1. Preparation presentation <br />2. Set up and deliver presentation, answer questions, travel <br />V. Finalize project definition <br />1. Confirm final direction with City Staff— teleconference <br />2. Prepare memorandum for PS &E Team confimvng project definition — summarize City <br />Staff direction and consultant team recommendations to supplement the drawings and <br />estimates, in order to transmit a complete record of design intent for a succeeding phase of <br />construction documents preparation. <br />W. Project Management - This task provides an allowance for project management tasks such as <br />project documentation, invoicing, and record keeping corresponding to tasks to be performed in <br />Task II. <br />
The URL can be used to link to this page
Your browser does not support the video tag.