My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-05-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:27:49 PM
Creation date
5/8/2003 4:36:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. - 2 " EXHIBIT "D" <br />CITY OF REDWOOD CITY <br />AND BHV INNISFREE VENTURES I, LLC <br />DOWNTOWN UNDERGROUND PUBLIC PARKING FACILITY PROJECT <br />PRECONSTRUCTION DESIGN SERVICES <br />The undersigned, David C. Irmer, a Developer Representative, hereby requests <br />payment for the reimbursable costs as referenced in the Amended and Restated <br />Disposition Agreement, Section 518 D, described in the Exhibits "A" through "C" <br />attached hereto. <br />In connection with this Payment Request, the undersigned hereby represents and <br />warrants to the City as follows: <br />1. He is the Developer Representative, qualified to execute this request for payment <br />on behalf of the Developer, and is knowledgeable as to the matters set forth <br />herein. <br />2. Each of the reimbursable costs described in Exhibits "A" through "C" has been <br />completed in accordance with the scope of services as described in the Amended <br />and Restated Disposition Agreement, Section 518 D. <br />3. The true and correct Actual Cost of each item for which payment is requested is <br />set forth in Exhibit "C ". <br />4. Attached hereto are invoices, receipts, worksheets and other evidence of costs <br />which are in sufficient detail to allow the City Engineer to verify the Actual Cost of <br />each item for which payment is requested. <br />5. To the extent that this payment request is with respect to a completed item of work, <br />the Developer has submitted or submits herewith to the City as -built drawings or <br />similar plans and specifications for the items to be paid for as listed in Exhibit "A" <br />hereto with respect to any such completed item, and such drawings or plans and <br />specifications, as applicable, are true, correct and complete, and, to the extent <br />applicable, has complied with all requirements of the Improvement Agreement. To <br />the extent that this payment request is for an Item, the Developer has in their <br />construction office a marked set of drawings or similar plans and specifications for <br />such Items as listed in Exhibit "C" hereto, which drawings or plans and <br />specifications, as applicable, are current and show all changes or modifications <br />that have been made to date. <br />6. There has not been filed with or served upon the Developer notice of any lien, right <br />to lien, or attachment upon, or claim affecting the right to receive the payment <br />requested herein which has not been released or will not be released <br />simultaneously with the payment of such obligation, other than materialsmen's or <br />Exhibit "D" <br />Page 1 of 2 <br />sftrary/underground parking garagelPammg Facility- Exhibits A.B,C 8 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.