My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-05-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:27:49 PM
Creation date
5/8/2003 4:36:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/12/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wagstaff and Associates <br />City of Redwood City <br />April 16, 2003 EXHIBIT B Syufy Project EIR <br />1 a )(a Page VI -1 <br />Vi. FEE ESTIMATE <br />Please note that the cost estimate and compensation schedule described below are <br />preliminary we can, of course, modify or refine any aspect of our proposed work <br />Program and related budget to meet additional or reduced City needs. <br />1. Estimated Contract Fee <br />The estimated Wagstaff and Associates contract fee for professional labor and miscellaneous <br />costs described herein through preparation and submittal of the Draft EIR and Final EIR <br />Addendum totals $141,330, including the Fehr & Peers Associates transportation and <br />circulation analysis (see Attachment A). Cost breakdowns, including current labor rates, are <br />itemized in Table 1. <br />The Wagstaff and Associates contract fee total includes attendance at the specified meetings <br />(see Task IX) and the printing and delivery to the City of ten (10) copies the Administrative <br />Draft EIR, three (3) copies of the "Screen Check" Draft EIR, seventy -five (75) copies of the <br />public release Draft EIR, ten (10) copies of the Administrative Draft Final EIR Addendum <br />(responses to comments), seventy -five (75) copies of the Final EIR Addendum, and related PC <br />computer disks for all products. <br />The estimate is based on the assumption that no more than 528,000 of the total Wagstaff and <br />Associates fee will be allocated to preparation, reproduction, and delivery of the Administrative <br />Draft Final EIR Addendum and the Final EIR Addendum. <br />Any additional services requested of the EIR consultants by the City for labor (revisions, <br />meetings, testimony, etc.), reproduction (additional copies), or other items beyond the scope of <br />work described herein and itemized below would be billed to the City on a time - and - materials <br />basis at our standard rates. <br />2. Fehr & Peers Tasks and Options <br />Fehr & Peers Associates' services would be limited to: <br />. completion of all technical computations (revised modeling to: incorporate the appropriate <br />cumulative traffic assumptions, switch projects, incorporate the latest anticipated <br />residential /retail characteristics for the Syufy Project, and associated trip generation and <br />trip distribution revisions); <br />. preparation of associated new tables and diagrams; and <br />WP9.016341634. EXA <br />
The URL can be used to link to this page
Your browser does not support the video tag.