Laserfiche WebLink
- EXHIBIT B-1 <br /> SCHEDULE OF FEES <br /> /~arch 1, 2003 to December 31, 2003 <br /> <br />PERSONNEL <br />Supervisory Engineer ...................................................................................................... 105.00-135.00/hr <br />Senior Engineer ...................................................................................................... 95.00-120.00/hr <br />Supervisory Biologist .................................................................................................................... 85.00-110.00/hr <br />Senior Fisheries BioLogist .......................................................................................................... 80.00-105.00/hr <br />Staff Engineer or Biologist ...................................................................................................... 65.00-75.00/hr <br />Supervisory Pest Control Operator .............................................................................................. 55.00-70.00/hr <br />Staff Pest Control Operator ...................................................................................................... 35.00-45.00/hr <br />Senior Technician ............................................................................................................................ 50.00-60.00/hr <br />Staff Technician ............................................................................................................................ 30.00-45.00/hr <br />Technical or Office Assistant .............................................................................................. 25.00-35.00/hr <br /> <br />Draftsman or CAD Draftsman (equipment included) ..................................................... 60,00-80,00/hr <br />Principal - Special Consultation .............................................................................................. 150.O0/hr <br /> <br />PROFESSIONAL SERVICES <br /> 85.00/hr <br />Lagoon Surveys ...................................................................................................... <br />(IncJudes Boat with motor, Senior Technician or pest Control Operator) <br />Travel time and Launch fee ...................................................................................................... 30.00/hr <br />Harvester ...................................................................................................... 150.00/hr <br />(Includes one Senior Technician, one Staff Technician, conveyor trailer, <br />vehicle to tow trailer and fueL) <br />Transport Fee ............................................................................................................................ 200.00/hr <br />(Charged for the first day of a harvesting cycle) <br />Launch Fee <br />Concrete ramp provided ...................................................................................................... No Charge <br />Tilt Trailer used to launch and retrieve 250.00 <br />Crane used to launch and retrieve Cost + 15% <br />Vegetation Disposal <br />Within one mi[e, each way, of the launch site .................................................................. INC <br />Any distance over one mile each way ................................................................................... 2.50/mile <br />If needed to be loaded in dumpsters, per man ..................................................................25.00/hr <br />Chemical Application of Al~aecide EarthTec .................................................................. 55.00/gal <br />(Includes chemicals, boat with motor, spray equipment, Chemical <br />Applicator and Staff Technician) <br />Chemical Application of Herbicide REWARD .................................................................. 175.00/gal <br />(Includes chemicals, boat with motor, spray equipment, Chemical <br />Applicator and Staff Technician) <br />MISCELLANEOUS <br />Requested Overtime: 125% of Regular Rates <br />Outside Services / Rentals / Permits / Job Materials: Cost + 15% <br />Expert Testimony and Courtroom, Deposition or Hearing Attendance: 150% of Regular Rates <br /> <br /> Waterworks Industries, inc. <br /> March 1. 2003 - December 31,2003 7 of 7 AGMT-272.Task Order No. 5 <br /> <br /> <br />