Laserfiche WebLink
r <br /> i <br /> , <br /> , EXHIBIT <br /> ESTIMATED COSTS FOR <br /> REDWOOD CITY BRIDGES REPAIR <br /> ..... .; . ..:.YA81511194ustat90 . ::: - :::.:: •.ToTsu.', 74t/u..: : °TgTAt.: :: <br /> Co: tgNan. ; D3PA'' ESTiYA7H1 <br /> .......... TASK:: .;':.':'. >'.: :::..: .....: ... :. ....:.::.........:.......,..... _ <br /> TASK 1 • Project Management and Coordination <br /> 1.1 Management 2,040 1,280 3,320 3,320 <br /> 1.2 Mck -off and Design Team Meetings 1,020 640 1,660 1,660 <br /> 1.3 ProjectSchedrle 255 640 895 895 <br /> Subtotal Task 1 3,315 2,560 5,875 5,875 <br /> TASK 2 Grant Research and Application Preparation <br /> 2.1 Research gent opporWrides for bridge repaks 345 345 345 <br /> 2.2 Prepare gent app&cations 920 920 920 <br /> Subtotal Task 2 1,265 1,265 1,265 <br /> TASK 3 • Prepare Citywide Bridge Report <br /> 3.1 Prepare Citywide Bridge Report <br /> 3.1.1 Data Collection 320 180 500 500 <br /> 3.1,2 Coordinate Permitting 255 320 575 575 <br /> 3.1.3 Perform Field Reviews 3,840 2,160 6,000 6,000 <br /> 3.1:4 Perform Bridge Pkwy Bridge cam testing 510 320 830 5.000 5,630 <br /> 3.2 Prepare Bridge Report 6.400 720 560 7,680 7,680 <br /> 3,3 Meet with Calosns DLAEIStA and Maintenance Edon 1,020 640 1,660 1,660 <br /> SubtotalTask3 1,785 11,840 3,060 560 17,245 5,000 22,245 • <br /> • <br /> TASK 4 - Preliminary Engineering (35% Design) <br /> (Bridge Parkway Bridge Structure only) <br /> 4.1 Prepare Bridge Repair Strategy Report 6,400 1,800 560 8,760 8,760 <br /> SubtotalTask4 8,400 1,600 560 8,760 8,7601 <br /> TASK 5 -Final PS&E Design (Bridge <br /> Parkway Bridge Structure only) <br /> 5.1 Prepare 66 %Unchecked Plans 1,020 3,840 5,400 5,600 15,860 15,860 <br /> 5.2 Prepare 95 %Checked Plans 1,020 2,560 3,600 1,120 8,300 8,300 <br /> 5.3 Prepare Final PS &E 640 1,440 560 2,640 2,640 <br /> Subtotal Task 6 2,040 7,040 10,440 7,280 1 26,800 26,800 <br /> TASK 6 • Bid Phase Support (Bridge <br /> Parkway Bridge Structure only) . <br /> 6.1 Rebid meeting and response to bidder inquiries 510 320 830 830 <br /> Subtotal Task 6 510 320 830 830' <br /> TOTAL FOR PROJECT { 7,650 28,160 15,300 8.400 1, 60,775 5,000 65, <br /> Note: Pretminary and Construction Engineering costs are considered reimburseable work for projects eegble for the HOP program <br /> ASK 8 - ( OPTIONAL)- Preparation of Biological and Environmen <br /> dips (Bridge Parkway Bridge <br /> Mere only) <br /> &1 Meetings and Coordmadon 5,000 5,000 <br /> 26 .000 20,000 <br /> 8.2NEPATeduical Study and Cat Ex <br /> 8 3 CEILI tr9dal StudyRtidgated Negative Declaration 25,000 25,000 <br /> 8.4 Regulatory Agency Permits 25,000 25,000 <br /> Subtotal Task 8 _ 75,000 75,000 <br /> TASK 9 • (OPTIONAL) • Underwater Inspection of fourcolumns 1 <br /> (Bridge Parkway Bridge Structure only) 1 <br /> 9. 1 Underwater Inspection of four waterwaycolumns 8,000 8,000 <br /> Subtotal Task 8 8,000. 8,000 <br /> • <br /> • <br /> • <br />