My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-11-08
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 11:55:06 AM
Creation date
11/4/2010 2:20:38 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
11/8/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1 D <br /> � � Page 16 <br /> Redwood Ury, CA—lBlS�nterprlse EnergyManagrrnenisyscem • <br /> • integratlon �ngfnaertng: I <br /> I <br /> o lBS wlll provlde the following Hardware & manage Its lnstallatlon � ' <br /> • (4) Verfs CT's I <br /> • {4) ICP Pulsa Meters i <br /> ■ (4} tBIS CornmunlcaUons Panels I <br /> I <br /> 0 1BS wfli engfneer the followtng cebling Instaf(atlons: <br /> r Ethernet tAN Drops to the IBIS Communlcatlons Panels <br /> ■ Power Runs to the lBtS CommunEcatlons Panels <br /> f <br /> ' • • �fectrica! & GssMetering � <br /> o(r�tegraterl Bullding Solutfons wlll provlde both the instaltailon ot CT's used for monitor)ng <br /> eiectrical servtces and the wtring/terminatlons for natural gas monlraring. AI� tnstallation and <br /> wlring for new panels and devlces st�all be lnciuded as fndicated below unless noted otherwise; ' <br /> • Pollce sta![on. � ' <br /> � Install neuv Integration panef and 120vac powen I <br /> • Insta(f new Cf on mafn breaker. <br /> • install cable between panel and G7. j <br /> • � lnstall cable between Integ�atlon pane! and gas pane! f � , <br /> • Instal! netwark cabie from new integratlon panef to IDF room. i <br /> +� Ftre Statlon� ' � <br /> • lnstall new tntegratlon panel and 12ovac power. � <br /> • instal! new C7 on maln breaker. ( <br /> • Install cable between panel and CT. � <br /> • Install cable Betwean integration panel and gas panel f ' <br /> • Install network cable from naw itrtegration panei ta IDF room. : <br /> ■ MSC Building; I �' <br /> • fnstalf new tntegratlon panels end 12�vac power. <br /> � install new CT on rna(n breaker. <br /> • lnstati cable betwaen panel and Ct'. <br /> • instalt cable between integratlon panet and gas panai <br /> • Instalf network cable from new Integratlon panel to IOF room. <br /> ■ Redshores Library; . <br /> • lnstall new Integratlon panei and �20vac powar. _ <br /> • Install new CT on maln breaker, <br /> • Instalt cabte between panel and Cf. ' <br /> • lnstall cable between lntegratlon panel and gas pane! <br /> • Instalf network cable from new lntegratlan pane! to IDF room, I <br /> Integrated ButEdingSolutlons, Inc. �.+��•, •: ��.• p 8$8 j 3 <br /> � <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.