My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-05-19 Supplemental
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-05-19 Supplemental
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:25:13 PM
Creation date
5/19/2003 9:15:28 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Date
5/19/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />May 19, 2003 <br />Subject <br />Award of Contract — Repairs to Elevator — Fire Station No. 9 <br />Recommendation <br />Approve the Contract Documents and award the contract for the Repairs to Elevator - <br />Fire Station #9 to the lowest responsible bidder, San Francisco Elevator of San <br />Francisco, California for their low bid amount of $52,022. <br />Background <br />The elevator in Fire Station #9 has unexpectedly failed and is in need of repairs. Staff <br />has contacted several elevator contractors to determine the cause of failure and believe <br />that the hydraulic cylinder in the bottom of the elevator pit is leaking and needs <br />replacing. Due to this failure, the employees, visitors, and vendors must climb the stairs <br />to gain entrance to the two upper levels. <br />One bid for the above - referenced project was opened in the Office of the City Engineer <br />(public counter — Maps & Records area) May 14, 2003, and is summarized below. <br />Rank <br />Bidder <br />Amount <br />1. <br />San Francisco Elevator — San Francisco, CA <br />$52,022.00 <br />The low bid of $52,022 is approximately 35% higher than the Engineer's Estimate of <br />$38,500. The higher cost is attributed to the cost of removing and placing the soil <br />around the hydraulic cylinder in 55 gallon drums, and recycling the spoils. This process <br />is necessary due to hydraulic fluids leaking from the elevator shaft. <br />After reviewing the contractor's bid, and clarifying the scope with the contractor, staff <br />recommends award of this project. The contractor's bid is responsive, and he is willing <br />to consider value engineering after investigating what repairs are necessary for the <br />elevator. This in turn may reduce the price of the contract. <br />Alternative <br />Do not award the contract for the Repairs to Elevator — Fire Station No. 9, which <br />impacts employees and visitors gaining access to the upper floors. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.