My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2010-11-22 clsd and regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2010
>
AgdaPkt 2010-11-22 clsd and regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2012 11:22:57 AM
Creation date
11/18/2010 5:05:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council and Redevelopment Agency
Date
11/22/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2A <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the Cit Mana er <br /> November 22, 2010 <br /> SUBJECT <br /> Final Acceptance — Red Morton Barbeque Area Shade Structure Project <br /> RECOMMENDATION <br /> Accept, by motion, the Red Morton Barbeque Area Shade Structure Project and <br /> authorize the release of bonds and retention according to city procedures. <br /> BACKGROUND <br /> On February 8, 2010, Council awarded the construction contract for the Red Morton <br /> Barbeque Area Shade Structure Project to McNabb Construction, Inc. of Lafayette for <br /> the amount of $162,400.00. The project consisted of replacing the covered aluminum <br /> picnic area with a new fabric shade cover, installing new barbeques and picnic tables, <br /> and other improvements. <br /> Notice to Proceed was issued on May 1, 2010 and substantial completion was achieved <br /> on October 1, 2010. The project schedule was extended from three to five months due <br /> to the lead time to fabricate the shade structure. Two (2) change orders were issued <br /> resulting in a net credit of $7,299.10. A credit was issued to reflect the lower cost of the <br /> shade structure selected and there was an additional cost for concrete paving that had <br /> not been anticipated. The final contract amount is $155,100.90 and 4.5°!0 less than the <br /> contract amount initially awarded. The work has been inspected to ensure that it was <br /> completed in accordance with the project plans and specifications and complies with <br /> city standards. <br /> ALTERNATIVES <br /> Council may choose not to accept the project or authorize the release of bonds and <br /> retention which would be contrary to the terms of the contract and prior Council action. <br /> FISCAL IMPACT <br /> Sufficient funds have been previously appropriated for this project as Capital <br /> Improvement Fund -- Red Morton Park Covered Picnic Area Replacement and from <br /> Contingency. <br /> � V' <br /> Brian Lee, PE, FM S. eter Vorametsanti, PE, PTOE, CFM <br /> Senior Civil En ineer City Engineer <br /> �k/�- �S <br /> Chu Chan , P, LEED AP <br /> Building, Infrastructure, and Robert B. Bell <br /> Transportation Director Interim City Manager <br /> ATTACHMENTS <br /> None <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> None <br />
The URL can be used to link to this page
Your browser does not support the video tag.