Laserfiche WebLink
P ROG R ESS TO DATE <br /> „ „ . . -. . • : ,, ,,, <br /> - <br /> • � � • � • <br /> zooz, Phase I— 66" pipe micro-tunnel through $�,500,000 <br /> H ighway � o� <br /> zoo5, Phase II — Storm pipes/system replacement $�,000,000 <br /> in the Fifth Avenue drainage area <br /> zoo7, Fifth Avenue Pump Station outfall structure $�50,000 <br /> constructed <br /> Funds Remaining $6,050,000 <br /> �r <br />