Laserfiche WebLink
Longstanding �"a chronic & persistent flooding in the area has occurred for at <br /> issue least 29 of the last 50 years�" <br /> Exacerbated in �Three major incidents in less than two years <br /> recent decades <br /> Intent & plans �After EI Nino flood of 1998, Redwood City developed a Flood <br /> Control Program. The multi-phased program included <br /> stormwater transmission pipelines, pump station upgrades <br /> and improvements to the Canal. $10M was set aside. <br /> It is complicated �Breadth of constituents; e.g., Redwood City, Menlo Park, <br /> Atherton, Cargill, Fish and Game, Army Corps, et. al. <br /> Pushing through �The Flood Control Plan was developed over 10 years ago. A <br /> to activation portion has been completed. There are several options that <br /> could be activated. $6M remain in funds. <br /> The time is now �The ultimate solution is decades in the future. The residents <br /> of the Bayfront Canal Drainage Basin ask to work with <br /> Redwood City to activate a solution now. <br /> ' The Bayfront Canal Improvement Project report (Winzler & Kelly 2003) 3 <br />