My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res50 874
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1950-1959 partial
>
1950
>
Res50 874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 11:47:55 AM
Creation date
11/29/2010 11:47:55 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
5/15/1950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> • <br /> (a) The improvement of Poplar Ave- <br /> nue by constructing and installing <br /> therein 2" asphaltic concrete paving <br /> with 6' crusher run rock btoe 31' in <br /> width, standard concrete curbs, gut- <br /> ters and 5' width concrete sidewalks <br /> on both sides thereof, for its entire <br /> length from its intersection with the <br /> westerly line of that tract of land in <br /> Redwood City known as Porto la Ad- <br /> dition to its intersection with Junipero <br /> Avenue. <br /> (b) The improvement of Virginia <br /> Avenue the same as for Poplar Ave- <br /> nue in (a) above from its intersec- <br /> tion with Poplar Avenue to its in- <br /> tersection with Redwood Avenue. <br /> (c) The improvement of Junipero <br /> Avenue the same as for Poplar Ave- <br /> nue in (a) above from its intersection <br /> with Poplar Avenue to its intersec- <br /> tion with Redwood Avenue, provided <br /> however that the complete intersec- <br /> tion of Junipero Avenue and Redwood <br /> Avenue shall be improved with as pb concrete paving and concrete <br /> gutters and standard concrete <br /> • s shall be constructed at the <br /> nmliw___71 corners of said intersection. <br /> The construction and installa- <br /> tion of two (2) 15" reinforced concrete <br /> pipe siphons across Virginia Avenue <br /> at its intersection with Poplar, Ave- <br /> nue connected with a standard con- <br /> crete catch basin to be constructed <br /> at each end of said sinlions; the con-,„ f <br /> struction and installation of a 15 (' <br /> reinforced concrete pipe storm drain <br /> across the intersection of Poplar and <br /> Junipero Avenues connected with a <br /> standard concrete catch basin to be <br /> constructed at each end of said storm <br /> drain; the construction and installa- <br /> tion of a le reinforced concrete pipe <br /> storm drain connected with the afore- <br /> mentioned catch basin to be construct- <br /> ed on the Easterly side of Junipero <br /> Avenue at its intersection with Pop- <br /> lar Avenue, extending approximately <br /> 82' in an easterly direction from said <br /> catch basin in a 5' easement Mona <br /> and contiguous to the -northely line <br /> of Lot 13, Block 3, Portola Addition <br /> connected to a 15" corrugated metal <br /> pipe approximately 2d' in length to <br /> be installed in said easement <br /> (e) The construction of a 15" rein- <br /> forced concrete pipe siphon across <br /> Junipero Avenue at Redwood Avenue <br /> connected with a standard concrete <br /> catch basin,to be constructed at either <br /> end thereof. <br /> (f) The construction apd installa- <br /> tion of all necessary appurtenances to <br /> complete the work described in (a) to <br /> (e). inclusive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.